Loading…
Loading…
8,368 results • Best match
Construction of Civil Work, Providing and Laying of Rising Main, Distribution system and S/E of pumping machinery for T/well Dangoh Upper).
Excavation in foundation trenches upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing or pumping out water, blasting soft / hard rock or chieselling soft/ hard rock where blasting is prohibited, in all lifts including trimming and dressing of sides, levelling of beds to correct grade including, shoring, strutting, planking, timbering and dewatering, wherever required, stacking the useable and unuseable material/ soil separately and after laying, jointing and testing of pipes returing the useable soil in trenches in 15 cm ( Fifteen centimeter ) layers including consolidating of such deposited layer by ramming and watering and then disposing of all surplus excavated soil / un-useable materials as directed within all leads and lifts including restoration of un-metalled surface to its original condition and including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect within all leads and lifts and to the entire satisfaction as per the directions of Engineer-in-Charge.
DEPOSIT-Fire and Rescue DG Office-Pantry Renovation -General Civil Work
Civil Works
Renovation of Second Floor Area (Civil works) at Bank’s Main Office Building, Bhubaneswar
Jal Jeevan Mission (JJM)-Jal Jeevan Mission 2021-24-Phase II -WSS to Varavoor Panchayath Construction of 9.4LL OHSR-General Civil Work
.I pipes and specials, including testing of joints:200 mm diameter pipeì100.31.1.10:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 450mm diameter, Class I.ë100.31.1.7:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 300mm diameter, Class I.ë100.31.1.5:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 200mm diameter, Class I.3.Construction of Valve Chamber|OD98737/2023-2024:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift from 1.5 m to 3 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m -Ordinary Rockå4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)@13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand).4. Construction of Compound wall at OHSR site.OD261506/2022-2023:Dry Rubble Masonry with Hardstone in foundation and superstructre including cost of materials and Labour charges7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc completee13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointingÙ13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work5.Construction of Sheet pileO100.6.1:Providing steel sheet shoring to the sides of the trenches to depths of above 4.00 m but not exceeding 6.00m using 6 mm M.S. sheet 0.50 M wide stiffen on edges with 50 mm x 50mm x 6 mm M.S. angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.5 M above ground level suitably braced by horizontal walling pieces at 75 x 150 mm x 8 mm angles on either side at intervals not exceeding 1.50M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed, dismantling, cleaning and restacking for reuse including all labour, hire charges and conveyance for equipments, tools and plants and sundries etc. complete.
Jal Jeevan Mission (JJM)-Jal Jeevan Mission 2021-24-Phase II -WSS to Kandanassery Panchayath -Construction of 10LL OHSR-General Civil Work
CERTAIN REPAIRS TO COMPOUND WALL STONE MASONRY WALL BOUNDARY WALL, FENCING CONCERTINA COIL AND OTHER MISC CIVIL WORKS AT SPDC, WED, DSRV, TS MAHUL, NSD MANKHURD, BCF AND NSD WEWRI UNDER GE (NW) MANKHURD.
S & F framed work such as grills, gratings etc., with ends of bars shouldered and/or riveted, or forget into spikes; framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework of water tanks and similar work conforming to Fe 290 Gde E 165 including dismantling of old/existing steel work of any type/section complete all as specified and directed by EIC.