Loading…
Loading…
8,082 results • Best match
Additional work related to IPHS compliance of Building less Sub Health Centres (SHC)-HWC ( Civil and S P Works) at Tikashi SC under Khejuri-I block, Nandigram HD
Additional work related to IPHS compliance of Building less Sub Health Centres (SHC)-HWC ( Civil and S&P Works) at Tikashi SC under Khejuri-I block, Nandigram HD
Additional work related to IPHS compliance of Building less Sub Health Centres (SHC)-HWC ( Civil and S P Works) at Dhamai SC under Contai -III block, Nandigram HD
Additional work related to IPHS compliance of Building less Sub Health Centres (SHC)-HWC ( Civil and S&P Works) at Dhamai SC under Contai -III block, Nandigram HD
Additional work related to IPHS compliance of Building less Sub Health Centres (SHC)-HWC ( Civil and S P Works) at Panchghori SC under Bhagwanpur-II block, Nandigram HD
Additional work related to IPHS compliance of Building less Sub Health Centres (SHC)-HWC ( Civil and S&P Works) at Panchghori SC under Bhagwanpur-II block, Nandigram HD
Civil Work related to Construction and Interior Decoration of 03 Luxury Suits in the Guest House located in Campus 24 bate 3 of Financial Management Training and Research Institute Uttar Pradesh Lucknow
CIVIL WORK Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
ANNUAL MAINTENANCE OF RWSS TO VAZHAPPALLYKURICHY AND MADAPPALLY LEAK RECTIFICATION AND OTHER MAINTENANCE WORKS AT VAZHAPPALLY KURICHY AND MADAPPALLY PANCHAYATHS FOR THE PERIOD OF 2026 2027 General Civil Work
100.47.2.1:Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.
Urgent repairing and renovation work Civil Work of Acharya J.C.Bose Seminar hall in the Post Graduate Department of Physiology at Hooghly Mohsin College during the current financial year 2025-26.