Loading…
Loading…
Tender Value
₹11.1 L
EMD Value
₹27,823
Closing Date
22 Jun 2026, 1:00 pm5d left
Executive Engineer
KWA,P.H.Division,Thiruvalla
ANNUAL MAINTENANCE OF RWSS TO VAZHAPPALLYKURICHY AND MADAPPALLY LEAK RECTIFICATION AND OTHER MAINTENANCE WORKS AT VAZHAPPALLY KURICHY AND MADAPPALLY PANCHAYATHS FOR THE PERIOD OF 2026 2027 General Civil Work
2026_KWA_855830_1
E-tender No.03/2026-27/EE/PH/TVLA
Open Tender
Civil Works - Water Works
365 days
Vazhappally, Kurichy, Madappally
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
₹27,823
15 Jun 2026
15 Jun 2026
23 Jun 2026
15 Jun 2026
22 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Working Charges | ||||||
| 1.001 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | - | cum | - | - | BI01010001010000000000000515BI0100001115 |
| 1.003 | 16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | - | sqm | - | - | BI01010001010000000000000515BI0100001116 |
| 1.004 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | - | cum | - | - | BI01010001010000000000000515BI0100001117 |
| 1.005 | 100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | - | cum | - | - | BI01010001010000000000000515BI0100001118 |
| 1.006 | 100.99.1:Add extra for the rate of Earth Work Excavation to account for the difficulty of excavation and the idling of the labour / machinery. | - | cum | - | - | BI01010001010000000000000515BI0100001119 |
| 1.007 | 2.16.1:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m | - | sqm | - | - | BI01010001010000000000000515BI0100001120 |
| 1.008 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | - | - | BI01010001010000000000000515BI0100001121 |
| 1.009 | 100.47.1.2:Leak rectification work in 40mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. | - | no | - | - | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.57 MB
NITREVISED.pdf
Tender Documents • 1.05 MB
KWAtenderOLDNITtofollowORDER.pdf
Other Document • 0.23 MB
BOQ_1446478.xls
BOQ • 0.37 MB
SpecialConditionsforRunningContractWorks.pdf
Additional Documents • 0.05 MB
Download all tender documents and submit your bid