Loading…
Loading…
8,156 results • Best match
Annual Repairs & Maintenance Rate Contract For Civil Work Of Various Health Care Facility At Taluka & Dist. Porbandar, YEAR 2025-26
Brick work using common burnt clay building bricks having
Civil Construction and Development Work at Safety Park of NML TLCMP inMine Area
Total value of work as per bid document
Civil, Plumbing and Electrical works for Construction of Model AYUSH OPD Building at Taldangra SHD at RH at Taldangra BPHC in the district of Bankura , West Bengal under WBMSCL during the year of 2025-26
Civil, Plumbing and Electrical works for Construction of Model AYUSH OPD Building at Taldangra SHD at RH at Taldangra BPHC in the district of Bankura , West Bengal under WBMSCL during the year of 2025-26
Construction of Mata Mansa Bhawan office building in Mansa Devi Complex, Sector 5D, MDC, Panchkula including civil work, public health work, electrical internal and external work, fire fighting, CCTV camera and lift complete in all respect (including
[28.7]`Providing and applying waterproofing treatment using two component 100% solid content, hybrid polyurea/polyurethane, rapid curing and highly resilient fully bonded cured to membrane having a mixed density of 1.02g/l. Minimum recommended coverage rate is 1.5ltr/sqm in 2 coats to achieve a total DFT of 1.5mm. cured membrane shall exhibit: 1) Tensile strength ASTM D412 : )13 MPa 2)Tear Resistance ASTM D624C : 50 N/mm2 3) Shore A Hardness: 80 4)Elongation ASTM D412 : )450% 5 ( 1kg, CS 10 wheels,ASTM D 4060): 1.3 mg/1000 cycles 6) Service temperature: -20°C to plus 80°C 7) Resistant to Fire (EN13501-1)-Class E,d0 Manufacturers shall provide Certificate for Zero VOC, resistance to fire, 25 years life expectancy test certificate before the start of work. System includes supply , application and termination of coating all complete as per the manufacturer methodology. Clean the RCC slab/screed surface and wall for treatment by removing dust, dirt and layers of concrete over the surface. etc. by mechanical tools and wire brushing. Pressure grouting at construction joints or honeycombs with non shrink cementations grout by mixing shrinkage compensating admixture per bag of cement as per manufacturer’s recommendations. Prepare a side gola of 50X50 mm at the junction using polymer modified mortar. Providing and applying two component 100% solid content, hybrid polyurea/polyurethane membrane at coverage rate of 1.5ltr/sqm in 2 coats to achieve a total DFT of 1.5mm. It must be applied utilizing plural heated high-pressure spray proportioning machine/spray gun . Termination shall be done 300 mm above FFl by providing a groove cut of 30mm x 30mm and seal it with shrinkage compensated polymer modified mortar. Lay a 150 GSM geotextile layer to protect the coating from external damage on final coating before laying of screed concrete/final finish. It shall be applied as per manufactures specification. Rates are incl of surface preparation, grouting and chemical application only. (Rates for geotextile, protection plaster and final finishes such as screed or Brick bat filling for slope, china mosaic, tiles etc is not included in above item. It will be added as per EIC/clients requirements). ` [Through Rate]
Roof treatment Repair of floor and plaster painting and other miscellaneous civil work at 33 11KV SUb Station Chaudhariya Kannauj
Roof treatment,Repair of floor and plaster,painting and other miscellaneous civil work at 33/11KV S/S Chaudhariya,Kannauj
Construction of ICMR Centre for Bio-Medical Research at Hengrabari, Guwahati (Assam), SH: Left out work, alteration & addition miscellaneous Civil works and supplying and placing of office furntiture at Hengrabari, Guwahati, Assam