Loading…
Loading…
8,169 results • Best match
BUILDING WORK
Installation of pole by making the suitable size foundation by embeding the pole 1 mtr into the ground with necessary civil work and fixing the light on the pole equievalant make ISI marked as approved as per direction of Engg. in Charge.
Construction Setting up of Half Way Home Male Civil and Electrical works including High security boundary wall fencing with heavy duty iron gate development works etc at Tebronggre West Garo Hills District Meghalaya
Construction/Setting up of Half Way Home (Male) (Civil & Electrical works) including High security boundary wall fencing with heavy iron gate development works etc at Tebronggre, West Garo Hills District, Meghalaya.
GENERAL Capital Repairs and Maintenance Dredging of Fishing Harbours Munakkakadavu FLC Dredging of Channel to Munakkakadavu FLC General Civil Work
Annual Repair maintenance and Operation work Civil Electrical and Horticulture in ESIC Model Hospital Ramdarbar Chandigarh
Annual Repair and Maintenance (ARM) Work of ESIH Ramdarbar, Chandigarh
CIVIL RECTIFICATION AND STRENGTHENING WORK OF CONTROL ROOM BUILDING AT 33/11 K.V. S/S RAUNAPAR AND CONSTRUCTION OF BOUNDARYWALL AT 33/11 K.V. S/S RANI KI SARAY DISTT-AZAMGARH.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Pre and Post monsoon contract of civil work including repairs to rolling shutter,washroom upgradation and other misc. works at FSD Bilaspur,Raigarh,Kargi Road,Bishrampur,Belha,Naila,Sakti and Kharsia under DO Bilaspur for the year 2026-27
Plugging of roof leakages in godowns of GI sheet roofby providing and fixing silicon sealing compound, self drilling/self tapping screws of 5.5 x 55 mm with EPDM seal including removing exisitng water proofing mateials, if necessary, including providing necessary safety measures for the labours to work at higher elevation, ropes etc insurance coverage for labourers and required tools and plants, scaffolding etc complete greasing of turbo ventilators as per the directions of Engineer in charge. To be carried out without any delay and within 2 days from the date of receipt of notice to attend the work, throught the contract period. (Details of cost for 5000 MT capacity godown).