Loading…
Loading…
93,637 results • Best match
Annual Plan-EDACHERY GP 2025-26 CONSTRUCTION OF EDACHERY PANCHAYATH OFFICE BUILDING -PROJ NO 99/26-General Civil Work
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
GENERAL-Annual plan 2023-24-Construction of School building for Government Victoria L.P. School Chittur,Palakkad-General Civil Work
GENERAL SUB REGISTRAR TIRUR Taxes Department Registration Construction of New building for Sub registrar office Tirur General Civil Work
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Construction of additional accommodation Civil Hospital building at Bhawarna Tehsil Palampur District Kangra HP Sh Providing balance work therein
GENERAL-Mannarkkad Constituency-Navakerala Sadas - Construction of Building for Attapadi Pudur GTVHSS (Sl.No.86), Palakkad District-General Civil Work
10.25.2 Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Annual Plan IDP WORKS 2025 26 ELAPPARA GP CHINNAR SRI BHIMANKAL TEMPLE ROAD CONSTRUCTION 18 202526 General Civil Work
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)