Loading…
Loading…
92,971 results • Best match
Construction
eProcurement System Government of Jammu And Kashmir Created By: Anwar Ahmad Khan Khan Created Date/Time: 08-Jan-2026 04:27 PM Tender Title: Repair/ renovation of Police Station Bahi-e-Bahu Jammu under Account Head Minor Civil and electrical works in Demand 51 Police Tender ID: 2025_DGPJK_299382_9
Miscellaneous Civil Works like cleaning of marble flooring ,Painting of Porch, repair of PORCH roof etc at Lalkothi ,Darjeeling
eProcurement System of Government of West Bengal Created By: BINOD KUMAR SHARMA Created Date/Time: 11-Mar-2026 04:17 PM Tender Title: Miscellaneous Civil Works like cleaning of marble flooring ,Painting of Porch, repair of PORCH roof etc at Lalkothi ,Darjeeling Tender ID: 2026_GTA_1013752_1
GENERAL-Bridge safety Ordinary repair to hand rails of various bridges and providing W metal beam crash barrier in Kallukadavu bridge under Karunagappally bridges section Repairs to hand rails General Civil Wor
Handrail maintenance work
Construction of Community Centre (Panchayat Ghar) G P Mahal , Dev. Block Bhoranj . Distt Hamirpur (H.P.)(SH. Building Portion Civil work and W.S. and S.I. ) (Based on H.P.S.R. 2020).
Excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches etc. in earth work in all classification of soil such as pick work, jumper work, pick jumper work, blasting work, jumper blasting work, soft and hard blasting and saturated soil, de-watering, including wedging out rocks where blasting work is prohibited, chiseling or any other mixed variety of soil, de-watering and/or removal of slush and incidentals, lift upto any heights, stacking the excavated soil not more than 3 mtrs (Three meters) clear from the edge of excavation and then retuning the stacked soil in 15cm (Fifteen centimeter)layers, when required into plinths, sides of foundation etc; consolidating each deposited layer by ramming, watering and then disposing of all excavated earth as directed by the Engineer-in-Charge, within all leads, lifts of materials and other incidentals as per approved drawing, design and as directed by the Engineer-in-Charge. The rate is including octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government.
Construction of Community Centre (Panchayat Ghar) G P Beetan , Dev. Block Haroli . Distt Una (H.P.)(SH. Building Portion Civil work and W.S. and S.I. ) (Based on H.P.S.R. 2020).
Excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches etc. in earth work in all classification of soil such as pick work, jumper work, pick jumper work, blasting work, jumper blasting work, soft and hard blasting and saturated soil, de-watering, including wedging out rocks where blasting work is prohibited, chiseling or any other mixed variety of soil, de-watering and/or removal of slush and incidentals, lift upto any heights, stacking the excavated soil not more than 3 mtrs (Three meters) clear from the edge of excavation and then retuning the stacked soil in 15cm (Fifteen centimeter)layers, when required into plinths, sides of foundation etc; consolidating each deposited layer by ramming, watering and then disposing of all excavated earth as directed by the Engineer-in-Charge, within all leads, lifts of materials and other incidentals as per approved drawing, design and as directed by the Engineer-in-Charge. The rate is including octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government.
Construction of Community Centre (Panchayat Ghar) G P Brahampur , Dev. Block Gagret . Distt Una (H.P.)(SH. Building Portion Civil work and W.S. and S.I. ) (Based on H.P.S.R. 2020). )
Excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches etc. in earth work in all classification of soil such as pick work, jumper work, pick jumper work, blasting work, jumper blasting work, soft and hard blasting and saturated soil, de-watering, including wedging out rocks where blasting work is prohibited, chiseling or any other mixed variety of soil, de-watering and/or removal of slush and incidentals, lift upto any heights, stacking the excavated soil not more than 3 mtrs (Three meters) clear from the edge of excavation and then retuning the stacked soil in 15cm (Fifteen centimeter)layers, when required into plinths, sides of foundation etc; consolidating each deposited layer by ramming, watering and then disposing of all excavated earth as directed by the Engineer-in-Charge, within all leads, lifts of materials and other incidentals as per approved drawing, design and as directed by the Engineer-in-Charge. The rate is including octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government.