Loading…
Loading…
92,773 results • Best match
CIVIL WORKS
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Repair and Renovation work of Type 1 Building Block No 2 and 4 Electric Wiring of Type D Building and Construction and Repairing of Septic Tank in New Saryu Nahar Colony Gonda
Steel reinforcement for R.C.C. work ready to use “cut and bend” rebars of approved make from factory/workshop to construction site including placing in position and binding all complete upto plinth level & above plinth level.
Repair Renovation of Mayabunder Tehsil Office building including Construction of 01 No. Parking Shed at front side of the building under Sub - Division No.I, NACD, APWD, Mayabunder.SW-Renovation of DC Bungalow cum camp office under Sub Division No-I
Government eProcurement System Created By: Rakesh Kishen Created Date/Time: 17-Jun-2026 03:03 PM Tender Title: Repair Renovation of Mayabunder Tehsil Office building including Construction of 01 No. Parking Shed at front side of the building under Sub - Division No.I, NACD, APWD, Mayabunder.SW-Renovation of DC Bungalow cum camp office under Sub Division No-I Tender ID: 2026_APWD_23328_1
Re tender for Comprehensive Annual Repair and Maintenance ARMO of Civil and Electrical works at ESIC Hospital Vapi Gujarat.
Re-Tender for Comprehensive Annual Repair and Maintenance (AR & MO ) of Civil and Electrical works at ESIC Hospital Vapi, Gujarat. (Including all taxes)
Re Construction of Govt Primary School Building GPS Sardhar Education Block Rewalsar Distt. Mandi Himachal Pardesh Sub Head Construction of remaining civil works W Sand SI in Ground Floor Septic tank and colomn of First Floor etc
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation, trenches, drains (Any width or square metre on plan), including dressing of sides and ramming of bottoms, lift upto any height, including getting out the excavated soil and disposal of surplus excavated soil as directed in all kinds of classification, of soils such as pick work, jumper work, blasting work saturated soils including chiseling or any other mixed variety of soils, dewatering and / or removal of slush and other incidentals within all leads and lifts complete in all respect as per direction and satisfaction of Engineer-in-Charge. Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases.
GENERAL-Annual plan 2025-26- Infrastructural development works in farms- Renovation of Rain shelter Near pond at SSF,Karimannoor- General Civil Work
Special repair of rain shelter nearer to pond