Loading…
Loading…
94,805 results • Best match
Repair and Maintenance work of category 1 houses located at Civil Line Dhabrai in Firozabad district 2026 27
eProcurement System Government of Uttar Pradesh Created By: Atar Singh Created Date/Time: 05-May-2026 12:57 PM Tender Title: Repair and Maintenance work of category 1 houses located at Civil Line Dhabrai in Firozabad district 2026 27 Tender ID: 2026_CEAGR_1141231_1
CONSTRUCTION OF COMPOUND WALL, FENCING AND OTHER MISC CIVIL WORKS OF PROPOSED CBG PLANT SITE IN BENGALURU
AD CONSTRUCTIONS (GSTN-29ABMFA7613A2ZK) BID ID -991203
Construction of parking shed and other allied civil works at Officers Rest House at OPH Colony, Rohtak.
Construction of rainwater harvesting, grading and gravelling and other civil works at 132 KV GSS Sanwasa (Dausa)
(S-4.3.3)Construction of tube-well from ground levels and upto 100 Meter depth and above to accommodate housing and assembly pipe of following sizes in all types of alluvium strata by percussion/ rotary drilling method and with gravel as per IS:4097-1967 and packing as per IS:2800 (Part I -& II) 1979 as amended upto date (the work includes the cost of gravel & its primary packing and packing during development, lowering of housing & strainer assembly pipes, with supply and wrapping of coir-rope, wherever necessary, for arresting fine sand particles. The work will not include cost of housing pipe and strainer pipe assembly and development work, but work would be completed after obtaining sand free water). 200 mm Nominal bore.
Construction of New compound wall and miscellaneous Civil works in TE Compound at Malur under Kolar OA.
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspectionof work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment shall be made once irrespective of duration of scaffolding.Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done.
Construction of New shower room facilities at FH and miscellaneous civil works at RLG, BARC, Mumbai -400085
Providing and constructing Half brick masonry using Fly ash/ Fly ash Lime bricks with minimum 70 kg / Sq.cm strength of approved make and size in partition walls in C.M 1:4 (using crushed sand) including scaffolding, raking out joints, curing etc. complete and with stiffners of RCC 1:2:4 (105 X 75 mm size) at every 900 mm height including form work curing etc. complete as per specifications but excluding reinforcement in Super Structure up to Floor - II level. (Reinforcement will be paid under relevant item)