Loading…
Loading…
95,630 results • Best match
Proposed Renovation work of Secretariate Building- Civil work at Hindpiri, Ranchi.
Mirror polishing on marble work/Granite work/stone work where ever required to give high gloss finish complete.
Upgradation of GPRA Qtrs. at Rabindra Nagar under Sub Division 1/N of N-Division (SC 208), New Delhi dg. 2026-27 SH- Repair and renovation work in D-1/4 & D-1/104 Rabindra Nagar Subwork/Packages: CIVIL WORK
Special repairs to damaged walls and other repair works in the main building of Government Higher Secondary School West Mambalam Chennai 34
eProcurement System Government of Tamil Nadu Created By: Emmanuel Jaikar E Created Date/Time: 09-Feb-2026 03:19 PM Tender Title: Maintenance work Tender ID: 2026_PWD_651724_1
Roof Treatment, Repair Of Window Door, Repair Of Floor At Office Of Sub-divisional Officer E U.Sub Divison Ist Quarsi And Roof Treatment, Plaster Repair, Toilet Repair, Painting And Other Civil Works At Office Of Chief Engineer (Distribution)Aligarh
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (DSR 10.25) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (DSR 10.25.2)
CONSTRUCTION OF TOILET FOR HANDICAPPED PERSON IN CIVIL COURT CAMPUS BHITARWAR DISTRICT GWALIOR UNDER DBARA SUB DIVISION DABRA (DEPOSIT WORK)
eProcurement System Government of Madhya Pradesh Created By: Onkar Nath Sharma Created Date/Time: 02-Jan-2026 03:10 PM Tender Title: CONSTRUCTION OF TOILET FOR HANDICAPPED PERSON IN CIVIL COURT CAMPUS BHITARWAR DISTRICT GWALIOR UNDER DBARA SUB DIVISION DABRA (DEPOSIT WORK) Tender ID: 2025_PWDRB_468953_1
ANNUAL PLAN PANNYANNUR GP PROJECT NO 243 CONSTRUCTION OF PROTECTION WALL TO KURICHIKKARA IRANJIKULANGARA MOKERI VAYAL THODU GENERAL CIVIL WORK
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil