Loading…
Loading…
96,131 results • Best match
Re Tender MP-LADS-2024-25 Construction of Kizhakke Karilakandiyil Meethal Foot path -Ward 8 Thalakkulathur GP.-General Civil Work
3.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
MLASDF 2025-26 - Sri. Mani C. Kappan MLA - Viswakarma Pulickalchira Road Construction in Elikkulam GP - Road Concretng - General Civil Work
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
GENERAL Annual Plan 2025 26 PR NO 84 Pothadi Lane 2 Road Construction W 8 Mulavukad GP General Civil Work
Pothadi Road Construction W-8
Annual Plan-Karukutty GP Pro No 185-26-Balaji kavala Mookkannoor Canal Bund Road Construction Ward-6-General Civil Work
3.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
Annual Plan/ VGP 2023-24/ PRJ 336/ PONNARAMKUNNU DWSS/TFC 6 L/ WARD-10/CONSTRUCTION OF WELL General Civil Work
WELL CONSTRUCTION
Annual Plan-S00497/25-CHALAKUDY MUNICIPALITY 2024-25 CONSTRUCTION OF TRAMWAY INDOOR STADIUM BYPASS UVVROAD W.21-General Civil Work