Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 LAccepted-AOC | ₹5.0 L Quoted ₹5.1 L | 1 | Accepted-AOC cancelled |
| Rank | Bidder | Total Amount |
|---|---|---|
| L1 | SHARAFUDEEN | ₹4,99,400.64 |
| Sl No | Description | Qty | Unit | SHARAFUDEEN L1 |
|---|---|---|---|---|
| 1.00WELL CONSTRUCTION | ||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 115.53 | cum | 211.7 ₹24,458.12 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 617.27 | cum | 105.23 ₹64,955.64 |
| 1.00 | OD389602/2022-2023:Sinking well in all classes of soil except hard rock which requires blasting to line and levels and plumb by scooping out from inside and below the stiening complete . (Upto 3.50M dia). First depth up to 3.0 mtr. Depth of sinking is reckoned from bed level
All kinds of soil | 3 | metre | 7,388.69 ₹22,166.07 |
| 1.00 | OD389603/2022-2023: Sinking well in all classes of soil except hard rock which requires blasting to line and levels and plumb by scooping out from inside and below the stiening complete . (Upto 3.50M dia). Second depth up to 1.50 mtr. Depth of sinking is reckoned from bed level
All kinds of soil | 1.5 | metre | 13,038.87 ₹19,558.31 |
| 1.00 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size) | 21.99 | cum | 8,465.02 ₹1,86,145.79 |
| 1.01 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 339.43 | sqm | 286.86 ₹97,370.04 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 803 | kilogram | 97.23 ₹78,075.69 |
| 1.01 | OD389609/2022-2023:Providing and fixing name board(CFC Fund) of size 150x120 cm with frame 40x20x16 G square rod including letter,priming<br>with synthetic enamel | 1 | 1 nos | 6,670.98 ₹6,670.98 |
Tender Value
₹5.1 L
EMD Value
₹12,701
Closing Date
17 Oct 2023, 11:00 amClosed
ASSISTANT ENGINEER
OFFICE OF THE ASSISTANT ENGINEER LID AND EW SECTION VELLAMUNDA GRAMAPANCHAYATH
Annual Plan/ VGP 2023-24/ PRJ 336/ PONNARAMKUNNU DWSS/TFC 6 L/ WARD-10/CONSTRUCTION OF WELL General Civil Work
2023_LSGD_610810_16
VGP/2023-24/TENDER_PHASE_3
Open Tender
Civil Works - Others
180 days
VELLAMUNDA GRAMA PANCHAYATH
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,120
Yes
₹12,701
Yes
29 Jun 2026
10 Oct 2023
18 Oct 2023
10 Oct 2023
17 Oct 2023
10 Oct 2023
Amount
WELL CONSTRUCTION
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
OD389602/2022-2023:Sinking well in all classes of soil except hard rock which requires blasting to line and levels and plumb by scooping out from inside and below the stiening complete . (Upto 3.50M dia). First depth up to 3.0 mtr. Depth of sinking is reckoned from bed level All kinds of soil
OD389603/2022-2023: Sinking well in all classes of soil except hard rock which requires blasting to line and levels and plumb by scooping out from inside and below the stiening complete . (Upto 3.50M dia). Second depth up to 1.50 mtr. Depth of sinking is reckoned from bed level All kinds of soil
5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD389609/2022-2023:Providing and fixing name board(CFC Fund) of size 150x120 cm with frame 40x20x16 G square rod including letter,priming<br>with synthetic enamel
Bidder Name
SHARAFUDEEN
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid