Loading…
Loading…
2,581 results • Best match
Upgradation/Renovation of Honble MPs Flats i/c tile work in bath rooms & kitchen, wooden work in Flat No. Deluxe-202, Brahmaputra-503 & other flat at B.D. Marg under Sub-Div.-IV of PaWD-III, New Delhi, dg. 2026-27. Subwork/Packages: Civil Work
ORDINARY REPAIR OF GOVT. BUILDINGS UNDER SUB DIVISION BALODABAZAR, KASDOL & BHATAPARA
Annual Repair and Maintenance of Public Buildings at Hill Top for the Year 2026-27
Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. meters and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50metres lead :
MAINTENANCE REPAIRS TO FLOORING PLASTERING PANELLING ETC AND ALLIED WORKS TO TEMPORARY BUILDINGS
Removing soil/ building materials/ debris Malba etc. to a distance of 15km or under, beyond the lead included in the rates, including loading, unloading and stacking at the destination away from the defence land
Repairing old building of Rathipur Barda Banipith HS School under SSM
Repair and maintenance of facade work in (G plus 7 Storeyed) Residence Buildings
Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works.