Loading…
Loading…
2,387 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Smart Energy and Smart Building Lab; Smart Energy and Smart Building Lab; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - Smart Energy and Smart Building Lab; Smart Energy and Smart Building Lab; Service Provider
Repair/Renovation of 1000MT Gdn.No.2,3 at Sheopur Distt Sheopur, of 1000MTGdn.No.-3,.5 at Morena Distt Morena,Rep.of 2000MT Gdn, Const.of Toilet Block of at Sabalgarh Distt Morena And Rep.of 1000MT Gdn.No.1 of Markfed at Ambah Distt.Morena (1st Call)
Repairing/Renovation work of 1000 MT Godown No.- 02 & 1000 MT Godown No.-03 in Campus of MARKFED at Sheopur Distt Sheopur, Repairing/Renovation work of 1000 MT Godown No.-3 & 1000 MT Godown No.-5 In Campus of MARKFED at Morena Distt Morena, Repairing/Renovation work of 2000 MT Godown, Construction of Toilet Block(Male/Female) of Markfed at Sabalgarh Distt Morena And Repairing work of 1000 MT Godown No. 01 of Markfed at Storage center Ambah Distt. Morena (1st Call)
REPLACEMENT OF IRON WINDOWS AND CORRIDOR SKYLIGHTS WITH UPVC AND ALUMINIUM WINDOWS ALONGWITH REPAIR AND PAINTING OF ASSOCIATED WALL AT ARC MAHIPALPUR AND PROVISION OF PICKLE BALL COURT AND RENOVATION OF CURTAIN MECHANISM OF MAIN AUDITORIUM AT TAG AND
Repair and Painting Works of Existing Office Building and Boundary wall at IWAI, RO, Patna.
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding.
Cleaning and repair of various location at New Secretariat Building during the year 2026 27
Uprooting and removing plants from the surface of walls parapet etc and making good damages. (Repairing of damages to be paid separately). (a) Small plant of girth of exposed stem upto 75 mm. lift upto 6 mtr.
Repair And Maintenance Of Nethaji Subaschandra Bose- Public Utility Building MG Road In East Zone
Repair And Maintenance Of Nethaji Subaschandra Bose- Public Utility Building MG Road In East Zone