Loading…
Loading…
2,416 results • Best match
Line works for erection, maintenance & Dismantling of overhead HT/LT line, T/C & HT/LT Aerial Bunch Cable(HVDS SCHEME) UNDER SIKKA SUB DIVISION UNDER CITY-2 DIVISION, JAMNAGAR.
Laying / re-laying XLPE/PILC cable by digging of pits, removal of old cable and laying of
Rejuvenation of New head works in Ellichatram at Villupuram Municipality
Earthwork excavation in all types of strata for CABLE LAYING with the standard trench width as per TWAD Board Circular No.28/AE10/P&D /2001 / dt.01.10.2001 & JCE (P&D) Lr.No.LM /AE10 /P&D/2001/ Dt.22.11.2001.Complete as per standard specfications. (1.05m depthx0.60m width) - WD-M2017
Providing and fixing of 9 Mtr. Mini High mast in ward no-7 at Zone-2 under limit of Municipal Corporation Gurugram.
Providing trench less cuttting by Hydraulic Drilling Device boring/ Manual OR through some suitable alternate method with insertion of HDPE Pipe including supply, Delivery of HDPE pipe at work site and laying of 50mm internal diameter HDPE pipe inside road for road corssing of cable by Hydraulic Drilling Device without opening of the road top surface, laid at a depth of at least 900mm below the road surface from the feeding point to the feeder pillar box in median (OR) from feeder pillar to respective street light pole including cost of all accessories for road crossing for laying of cables..
As per tender documents
Excavation in trenches n exc 1.5 Mtr wide and not exc 1.5 Mtr deep in hard/dense soil and getting out and levelling of bottom surface to required level for laying UG cable / errection of poles all as specified.
As per NIT
Supply and laying of XLPE insulated PVC sheathed Aluminum conductor armoured cable of 1.1 KV grade as per IS 7098 (Part-I) 1988 (amended up to date) of the following sizes to be laid in existing Trench/Ducts/Cable Tray/ RCC/ HUME/ METAL/ DWC pipe / on surface with the help of MS clamps of suitable size asrequired at site to the entire satisfaction of Engineer-in-Charge. The job includes labour charges of laying the cable and making connections with suitable size aluminum lugs/thimbles etc. The cable shall be of Polycab / Havells / R.R. Kabel/ KEI/ Finolex make only.
Balance work of Provision of IBSS in both UP & DN direction between Barsuan - Gagnaposh.
Preparation of cable duct 150 mm X 300 mm Metre deep for laying of cable in rocky area and refilling the duct (after cable laying) with concrete mixture of proportion 1:3:6 and grouting the ends at either sides of the rocky portion using concrete mixture with contractors on cement and other materials. Note: Cement should be of Gr. 53 and will be inspected by SSE/Tele in-charge before use.