Loading…
Loading…
2,412 results • Best match
8298 REPAIR/REFURBISHMENT OF LT PANEL AT NORTH WALL AND HUMVAD SUB STATION UNDER C.NO. 64 AT NAVAL DOCKYARD MUMBAI AND PROVISION OF AIR CONDITIONERS FOR PRP DEPARTMENT OF NAVAL DOCKYARD MUMBAI AND PROVISION OF SPLIT AIR CCONDITIONERS FOR PM DEPARTMEN
Taking down old unserviceable cable incl Supply, laying and testing cable XLPE insulated screened PVC bedded galvanised steel strip or wire armoured, electric power cables ( heavy duty) with Aluminium conductor, 1100 volts grade of size 185 Sqmm 3.5 core complete all as specified and as directed.
11/SE(T)/LCZ/2026-27
Laying of 11 KV XLPE cable 3x185 sq mm S/C by digging of trench 800 mm deep & 450 mm wide its boxing with bricks & sand, laying of cable filling of sand up to top cover of the trench properly levelling & ramming & covering with stone slab after laying of cable. (All material shall be provided by contractor except 11 KV cable)
PROVIDING ELECTRICAL POLES AND TRANSFORMER AT FRUITS & VEGETABLE MARKET & CATTLE YARD APMC YARD BASAVAKALAYANA
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff.2.5 to 25 Sqmm Including cost of materials, labour complete as p...
Re-Wiring and Replacement of damaged light points, fan points, TPN DB and fittings etc., for Department of Library and information Science, SVU College of Arts in SVU Campus, Tirupati
Earth work excavation of Trench in hard ground soil and Sand filling shall be provided at the bottom of trench before laying the cable and laying of U.G cables from 70 Sqmm up to 400 sqmm covering the cable with bricks and back filling of Trench duly providing route indicator at every 8 Mtrs distance embedded in C.C including cost and conveyance of materials and labour charges etc., complete.(Data No. 23-24-24.1.2)
Provision of 3 phase supply to proposed 2x25 kV TSS at Badnera i.e. (A) Supply & erection of EHV equipments for proposed 3rd phase of TSS-I & II bay at 220 kV Badnera S/Stn under EHV O&M Division, Amravati. (B) Stringing of 3rd phase for existing 220 kV Badnera TSS - I & II line (C)Conversion of existing 2-phase to 3- phase of 132kV Akola-TSS DCDC line along with replacement of existing 132 kV TSS I & II Bay equipment's under jurisdiction of EHV Line Maint. Sub Division - II, Akola & 220 kV S/Stn Akola under EHV (O&M) Division, Akola & 400 kV R.S. Division, Akola respectively, in connection with Up-gradation of Electric Traction System from 1x25 kV to 2x25 kV Traction System in Bhusawal division of Central Railway to meet 3000 MT loading target.
53 53 36A(a)Laying of Power cable, control cable, & Kilometre 0.50 15663.62 7831.81
Provision of IP Telephone Exchanges at Jharsuguda Station.
Cutting of concrete platform to a depth of 200 Metre mm and width of 100 mm to lay DATA cable and power cable through DWC pipe of 63/50 mm dia, Contractor has to redress the cutting place into its original position without destroying the beauty after cable laying, This includes pedestal cutting and redress into its original position after cable laying wherever required, This includes supply of DWC pipe of 63/50 mm dia, IS:14930, Pt.-II mark. Inspection of all materials will be done by consignee before use.