Loading…
Loading…
2,426 results • Best match
Installation of 40hp submersible Non clog motor for grass irrigation using treated water at Vidyaranyapuram sewage treatment plant
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff 120 to 240 Sqmm
Installation of poles and street lights in the conservancy developed behind Kamala Nehru Girls College in Ward No. 21 of Shivamogga City Corporation
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff LT Cable2.5 to 25 Sqmm
REPAIR/MAINT OF HIGH MAST LIGHT, SOLAR LIGHT, GATE/ GARDEN LIGHT/ FLOOD LIGHT/ FOUNTAIN LIGHT AND ALLIED WORKS UNDER GE (NORTH) BINNAGURI
M&L UPVC conduit pipe heavy duty 25 mm dia including excavation work for laying cable in conduit complete all as specified and as directed.
Providing First Floor Roof Sheet for new parking building (MLCP) at Main Market Yard of APMC Byadgi Under Annual Action Scheme 2025-26
Laying of cable in Eisting TrenchGI pipeStone WareRCC Hume pipe using WoodenAluminum Rollers as directed by the departmental staff.2.5 to 25 Sqmm
Provision of CCTV at 20 nos. of Non interlocking LC Gates and monitoring at 12 nos. of connected station and Engineering control over Kota Division
Excavation of trench as per cable route plan, Kilometre 1.2 mtr deep, 300mm wide at the bottom along main line in normal soil, This work includes covering of cable laid in trenches by loose soil for a layer of 50 mm thickness approximately before covering by shahabad stone/bricks, clearing of route, bushes etc and refilling of the trench by excavated soil and ramming after laying of the required quantity of cables as per instructions of Engineer at site. If it is not possible to reach the required depth at any location, then the contractor shall obtain prior approval of Engineer-in- charge before commencement of cable laying process and only then shall the proportionate payment be made to the contractor
As mentioned and described in BOQ
Material and labour for sand cushioning using dry and clean tibba sand in two layers, first layers of 80mm thick before laying of cable and second layer of 150mm thick after laying of cable in trenches/ducts including consolidation of each layers complete all as specified and directed. Note : Punned thickness shall be measured for payment.