PROVN OF STABILIZED 3 PHASE POWER SUPPLY AND OTHER E M WORKS IN TECH FLT AT AIR FORCE STATION PATHANKOT
Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 400 sq mm single core complete all as specified and directed by engr-in-charge.
SPECIAL REPAIR TO JCOs GOVT MD ACCN BLDG No P-685/01 TO 04 AT AJMER LINE UNDER THE AREA OF AGE B/R-I OF GE (ARMY) No 1 JODHPUR
Supply and spreading clean, dry, fine river sand for under ground electric cable in two layers (8cm thick before laying of cable & 15cm thick after laying cable to a total of 23cm) including gentle punning the sand upto 18cm (total thickness) and consolidated around cable for protection of UG cable complete all as specified and directed. NOTE:- For measurement purpose punned thickness shall be considered as per clause 19.75 of SSR Part-I.
PROVN OF OR INSTITUTE FOR RANGIA MIL STN UNDER GE RANGIA
M&L for Sand Cushioning (dry) in trenches/ducts for protection of UG Cables (below, above and around the UG Cable laid in Trenches) of 230mm Spread thickness (8 Cm in depth before laying the Cable and 15 Cm in depth after laying the Cable) and consolidated (punned) upto 180mm thickness, complete all as per specified and as directed by Engineer-in-charge. NOTE : For the purpose of Payment, Punned thickness of Sand Cushioning only will be measured and paid for.
CONSTRUCTION OF PRAJA SOUDHA- TALUK AADALITHA KENDRA AT HANURU TALUK, CHAMRAJNAGAR DISTRICT.
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff LT Cable
SPL REPAIRS TO LT OVERHEAD CONDUCTORS TO LT UNDERGROUND CABLES FROM 269 ER CIRCLE TO 269 ER OFFRS MESS AND FROM 269 ER MAIN GATE TO ARN GATE AT CME PUNE
M & L for bituminous road cutting to a width of 30 cm and depth 45 cm length up to 6 mtr for laying of pipe for laying of UG cables and making good with PCC (1:3:6) type cI (using 20mm grade stone aggregate)
S&T work in connection with Construction of a Loop Line for 3rd Line and one sick siding of length 70 M. at Talaburu.
Horizontal Drilling by using manual pushing Metre method (also called moling) at minimum depth of 1.5 meter below the formation level of earth as per decision of Engineer in charge. Boring diameter should be atleast 110mm. The ground level shall be considered ignoring the bank height of the bank of the road. Note: DWC/HDPE Pipe Supply is covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Payment of boring shall be made only after laying of the cables into DWC/HDPE/GI pipe.