Loading…
Loading…
2,789 results • Best match
INCOMPLETE ITEMS OF PROVISION OF STORAGE AND PROCESSING FACILITIES FOR MK-82 CHAFFS FLARES OF P-81 AIRCRAFT AT INS RAJALI ARAKKONAM INCLUDING RECTIFICATION OF DEFECTS
Laying only, testing cable XLPE insulated screened PVC bedded galvanised steel strip (or) wire armoured electric power cable (heavy duty) 1100 Volts grade with strandard aluminium conductor of size 4 core 16 Sqmm all as specified.
REPAIR AND MAINTENANCE OF LT EXTERNAL ELECTRIC SUPPLY AND ALLIED CONNECTED WORKS AT VSN CHILODA UNDER GE (AF) CHILODA
Excavation in trenches not exceeding 1.5m width and not exceeding 1.5m in depth and getting out in soft/loose soil for taking up/ laying cable/ pipe etc. complete all as specified and as directed.
Construction of Toilet Block Govt Municipal Girls High School Aska Road Berhampur under CSR fund 2024-25
Cable laying on wall surface with steel shaddle 25sqmm
Entrance Gate and Way side Amenity Centre near Kunduli Square for Integrated Development of Deomali in Koraput District
Laying of cable (Digging , laying and refilling with sand and Bricks)
Construction of New Commercial Centre G plus 2 Storey and Special School Ground Floor, Near Brindavan building including Civil, PHE works, Electrical works at Anushaktinagar, Mumbai at 400 094
Supply & installation of 250 mm dia heavy duty RCC Hume pipe of class 'NP3' to be laid in ground/from concrete cable trench to ground, for passing of cables with necessary joints, concrete supports. Scope includes escavation below ground level in all types of soil/concrete road cutting/foot path cutting, nallah cutting /any RCC wall/floor cutting including back filling, dewatering,consolidation, reinstatement of excess earth within the radius of 500 m and original,disposal making good to the original finish etc. spare space of hume pipes after cable laying and spares hume pipes shall be sealed properly with fireproof materials.
SPL REPAIR TO CERTAIN AIRMEN BILLETS AT AF STN LEH
Material & Labour for Sand cushioning to under ground cable with clean dry sand locally available with layer of sand 8cm thick before laying of cable and 15 cm after laying of cable complete all as specified & directed.