Loading…
Loading…
2,811 results • Best match
Electrification work in PHC Building at Norwa, Block Ahore, District Jalore
Add Extra for Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade direct in ground including excavation of trench of size 75 cm (Depth) x 35 cm(Width) , with procedure as per following points:- (a) Make a river sand bed of height 125 mm along the trench, (b) Lay the cable in the middle of the trench, (c) Provide river sand bed of height 125 mm on top of the cable, (d) Lay the protective Common burnt clay F.P.S. Bricks of Class designation 75 / Sand stone slabs of 50 mm thickness and 225 mm wide just above the sand bed vertically across the cable ( Approx. 9 no. Bricks per Mtr.), (e) Backfill the excavated soil leaving 300 mm from the Ground level, (f)Lay the Cable warning tape and again back-fill the remaining portion of the trench upto the ground level and compacting the earth
REPAIR TO INTERNAL WIRING AND OTHER CONCERNED WORKS AT DOMESTIC AREA UNDER AF STN AMRITSAR
M&L sand cushioning with a layer of dry river sand 80mm thick before laying of cable and 150mm thick (punned down to 100mm thick) after laying of cables, in trenches/ducts. Complete all as specified and directed Note: Punned down thickness (overall 18cm), shall be considered for measurement and payment.
CONSTRUCTION OF FIRE STATION AT INDUSTRIAL AREA MUSSOORIE GULAWATHI ROAD DISTRICT HAPUR
Supply and errection of Cable Stand of size 2.45x0.30 Mtrs. Above G.L. duly grouted with cement concrete upto 45 Cm. Depth for laying cables from L.T. side of transformer made of angle iron size (65x65x6mm) having welded M.S. flat of size 50x6mm on top middle and 45 mm above ground level for fixing cable by clamping with M.S. flat of 40x4mm size as per direction of E/I. complete in all respect as per E/I.
REPAIR REPLACEMENT OF INTERNAL WIRING AND ALLIED WORKS OF SUB STATIONS AND PUMP HOUSES AND OTHER EM INSTALLATIONS UNDER GE UTILITY AMBALA
Material and labour for dry sand cushioning to cable 8 cm before laying cable in trenches and 15 cm after laying the cable and compacting complete all as specified and directed.
Electrification work of Ambedkar SC Hostel building sirohi
Supplying and Laying coaxial cable 75 ohm impedance with foam PE insulated solid bare copper inner conductor, and Ist outer conductor of bonded alum. tape and second outer conductor of alum. alloy braid in existing surface or recessed conduit/casing capping including making connections as required.
Electrification work of Ambedkar ST Hostel building sirohi
Supplying and Laying coaxial cable 75 ohm impedance with foam PE insulated solid bare copper inner conductor, and Ist outer conductor of bonded alum. tape and second outer conductor of alum. alloy braid in existing surface or recessed conduit/casing capping including making connections as required.