Loading…
Loading…
2,813 results • Best match
Construction of New Civil Court Building at Village Sevaliya (Taluka Galteshwar) District Kheda
laying cable or locating the fault all over the run and back filling
UPGRADATION OF 02 BATHROOM IN BLDG NO. P-378, SPECIAL REPAIRS TO BLDG NO P- 41/06 AT ARMY CAMP PVM, PROVN OF TWO 2 TON SPLIT AIR CONDITIONERS AND MS SLIDING GRILL GATE (02 NOs) AND WINDOWS (04 NOs) FOR NAVAL COMMUNICATION NETWORK NODE ROOM
Disconnecting and taking out old unserviceable LT UG cable in trenches, wall & poles and taken as credit including supply and laying in trenches/poles/wall etc LT UG cable XLPE insulated, armoured, heavy duty with multistandard aluminium conductor, 1100 volts grade of size 4 Core 10 Sqmm confroming IS specification and of the following size:- Note:- Lugs and glands are deemed to be including in the rate quoted for laying of cable and to be used wherever required while connecting the cables to the panel board. Earth work such as excavation, refilling etc, shall be measured and paid seperately under relevant item:-
REPAIR / MAINTENANCE OF LT OH LINES, LT PANELS, SWITCH GEAR LIKE APFC PANELS AND LT UG CABLE INCLUDING SECURITY LIGHTS, SERVICE CONNECTION CABLES AND JUNCTION BOX AT VARUNAPURI UNDER GE (NW) VASCO
Excavation in trenches 1.5 Mtr wide and not exc 1.5 Mtr deep in hard/dense soil getting out and leveling of bottom surface to required level for laying UG cable/erection of poles complete all as specified and directed by Engr-in-charge.
SITC of Electrical Cables, Electrification work of pump house & panel room, Plant lighting, CCTV with associated work and other electrical, mechanical and civil work at Mahisagar based water sources of VMC (Percentage Rate basis) (2nd Attempt)
cable trench and laying cables in cable trench or cable tray. Cable Scrap/ debris shall be
REFRAMED OF THE DETAILED S&T SUB ESTIMATE FOR PROVISION OF LIMITED HEIGHT SUBWAY AT RISHRA STATION OF HWH DIVISION.
Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ 12 DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item includes provision of labels of coloured plastic adhesive tapes or any other identifiable material on each cable to give the cable number at each Gantry Post/hectometre post.(Cables will be meggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes. Above/
Construction of Govt. Nursing College Safidon, Jind.
[24.2.5.1]LT CABLE 5.1. Laying and fixing of cable on surface/ cable tray etc as required:- 2.5 Sq mm to 10 Sq mm 2 to 4 Core [Through Rate]