Loading…
Loading…
2,700 results • Best match
PROVISION OF 800 KW SOLAR POWER PLANT NEAR TITHWAL GATE OF SANSAR CHAND VIHAR UNDER GE (UTILITIES) UDHAMPUR
(j) Main distribution board Floor Mounted AC Panel (ACDB), AC Bus, Auxiliary Buses for required load as per site requirement on AC side of inverter complete all as specified and directed. (m) 1.1KV copper Armored LT power Cable as per IS 7098 from inverter to transformer of AC Cables of off sizes as required at site incl end joints , mid joints , complete all as specified and directed. (n) Earth continuity conductor or main earthing lead copper cable or GI strip of suitable size as per design and as required at site. (o) Suitable size HDPE pipe 6kgf/cm2 rating for cable protection including all necessary fitting and fixing arrangement complete as required at site all as specified and directed. Note: Necessary earth work sand cushioning protection pipe bricks etc shall deemed to be included for laying of cables HDPE pipe up to power transformer. (Contd.../)
Electrification work in connection with Provision of Running Room (18 rooms, 36 Beds) at BKI station.
Excavation of cable trench:-This item shall be operated in conformity with IS:1255(latest version) i.e. code of practice for installation and maintenance of HT/LT cables. The price shall cover cost of excavation of cable trench in all type of soil for laying LT cables and back filling the same with sieved earth and finishing the surface in its original condition after providing sand, & bricks in cross position. For LT/HT cables the trench shall be 600mm wide x 1000mmdeep. In 17 trench the cable shall be covered with rivers and at a depth of 100mm below the cable and 100mm above the cable than placing well-burned bricks continuously in cross position through out the cable route in the ground. The bottom of the trench should level free from stones and sharp edge of rocks etc. At the termination a loop of 5 meter(approx.) cable shall be kept as allowance and loops rings be formed as per the site condition, in the ground, The cost shall include the cost of all materials i.e. sand, bricks, cable route markers (grouted in the earth firmly with cement concrete so that it can not be uprooted by miscreants) etc at 25m.interval and each turn of the cable.
LAYING OF 8 INCH STEEL GAS PIPELINE BY HDD METHOD FOR CROSSING OF GURUPURA RIVER AND ASSOCIATED WORKS AT DAKSHIN KANNADA GA CGD PROJECT OF GAIL GAS LIMITED
Supply and installation of Test lead Points (TLP/Test stations) Small Size (300mm X 275mm X 230mm) Type A, with lockable door in weather proof IP-55 construction as per specifications and standard drawings complete with backlite connection plate, connection studs terminals, 4” dia heavy duty pipe, base plate welded at the bottom including MS bend for concrete base, M-20 grade concrete foundation as per standard drawings & miscellaneous works such as excavation and backfilling for foundation/trenches for cable laying. The work shall include PCC over foundation after installation of TLP, supply & fixing of a name plate containing the details like KM location, identification, TLP No., Marking of connection scheme, type etc., on the inside of the cover including the cost of all labour, materials, tools & tackles etc.
Electrical work in connection with, (i) Provision of Interlocking of 18 Nos. of LC gates having TVU > 20000 over Delhi Division. (ii) Provision of 13 L-xing gates having TVU more than 20000 and less than 50000 in Delhi Division.
Supply, laying, testing & commissioning of 160 mm dia. HDPE pipe (PE-100, PN-6) conforming to IS:4984 or latest, for cable laying by trenchless Horizontal Directional Drilling (HDD) method as per IS:1255, IE Rules, CPWD and Indian Railways specifications, including detailed route survey, marking of alignment, pilot drilling, reaming, supply and laying of pipe by pull-back method with butt fusion/electrofusion jointing, use of suitable drilling fluid, and maintaining required depth 33 and alignment (generally 1.5 m to 3.5 m or as directed). The work shall include preparation and submission of complete HDD report comprising route alignment drawings with chainage and coordinates of entry/exit points, section-wise details of HDD lengths, depth profile graphs (depth vs chainage), HDD logs, and photographic records, as per site requirements. The item also includes testing, quality assurance, protection of existing utilities, disposal of slurry, restoration of site, and all incidental works complete in all respects as directed by Engineer-in-Charge & as per explanatory note.
Telecom Works for Extension of PP shelter of PF No. 8/9 and 9A with kota stone flooring including utility shifting and development of adjoining area with proper ramp, cattle guard, fencing along track approach etc. of Charbagh station, Northern Railway
Cutting of all types of platforms/road crossing and trenching and excavation to a 08 width and depth of 300 mm x 300 mm, laying of DWC/HDPE/GI pipe in the trench and refilling and concreting it afterwards as per original condition. In hard rocky ground area , cables will be laid normally on layer of soft earth of 0.05 mtrs thickness previously deposited at bottom of the trench . The cutting to be filled and finished with cement/concrete, as per the RDSO drawing no. SDO/Cable laying/008, issued vide RDSO document no. RDSO/SI/G/2010 Version 1.1 dated 04.02.2014 or latest. Above/
External Electrification work of plots Area (Undergound system) in Sector-10 Siddharth Vihar Yojna, Ghaziabad
Supply and errection of Cable Stand of size 2.45x0.30 Mtrs. Above G.L. duly grouted with cement concrete upto 45 Cm. Depth for laying cables from L.T. side of transformer made of angle iron size (65x65x6mm) having welded M.S. flat of size 50x6mm on top middle and 45 mm above ground level for fixing cable by clamping with M.S. flat of 40x4mm size as per direction of E/I. complete in all respect as per E/I.