Loading…
Loading…
2,579 results • Best match
CONSTRUCTION OF 33KV LINE FOR 33/11KV SUBSTATION MIRZAPUR (SADAT TO MIRZAPUR/ BAHARIYABAD), DIST. GHAZIPUR ON SEMI TURNKEY BASIS
Excavation and preparation of standard size cable trench for laying of 33 kV, 3×300 sqmm XLPE cable, including dressing and leveling of trench bottom, providing fine sand cushioning minimum 75 mm before the laying of cable (providing temporary barricading, caution boards and necessary safety arrangements during execution of work shall be arranged by the contractor ).
CONSTRUCTION OF 33KV LINE FOR 33/11KV SUBSTATION BILARIDEEH (JIWADHIPUR TO JASORI), DIST. CHANDAULI ON SEMI TURNKEY BASIS.
Excavation and preparation of standard size cable trench for laying of 33 kV, 3×300 sqmm XLPE cable, including dressing and leveling of trench bottom, providing fine sand cushioning minimum 75 mm before the laying of cable (providing temporary barricading, caution boards and necessary safety arrangements during execution of work shall be arranged by the contractor ).
Upgradation of power line at I/A Malpura
Add Extra in item no. 11.1 to 11.4 for Laying Charges for cable through Vermeer machine by making pit at regular interval and repairing the pit after laying of cable with PCC/ Bitumin as required.
ADDITIONAL DT WORK UNDER EDD- RANIA
Laying & erection ofAB Cable (3*50+1*35+1*16)MM^2 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work.
ADDITIONAL DT WORK UNDER EDD- RANIA
Laying & erection ofAB Cable (3*50+1*35+1*16)MM^2 as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carries etc. required for proper completion of work.
PROVN AND INSTALLATION OF LIGHTENING ARRESTORS ALONGWITH ALLIED WORKS AT NFS NODE JOSHIMATH AND MANA INCLDING PROVN OF THREE PHASE ELECTRIC CONNECTION FOR FUNCTIONING OF KSP AT MANA UNDER GE 871 EWS.
Sand cushioning to protection of underground cables, laid 8 Cm before laying and 15 Cm after laying of cable, and punned to form an overall layer of 18 Cm thick, complete all as specified and directed. Note: Punned thickness shall be measured.