Loading…
Loading…
2,579 results • Best match
Construction of Mechanized Laundry in the premises of K.S. Roy T. B. Hospital----- External Electrical Installation work.
Laying of three cables 4 core x 240 sqmm in an underground trench in single tier formation (horizontal) the trench size : 915 mm x 760 mm average depth with brick protection on the top of each cable with 8 nos. bricks per Mtr. and 4 nos. bricks per mtr. as separator between every two cables including filling the space between the bricks and cables and also the trench with shifted soil, levelling up and restoring surface duly rammed .
Special Repair of 4 Nos ASPs and 1 No IG Residence RTC Bhondsi
[24.2.4.2]LT CABLE 4.2. Laying of underground cable in pipe /existing open/closed trench etc as required:- 16 Sq mm to 35 sqmm 2 to 4 Core [Through Rate]
Provision of EI alteration at JTJ Yard in connection with Safe running of VB, container and other Freight trains without any speed restriction over SBC main line & inconnection with Doubling of By-Pass line between Tirupattur - Somanayakkanpatti at JTJ along with provision of Speed enhancement at JTJ yard.
1.00 147833.50 relay racks, cable termination racks, SM's control panel, battery room, power room, termination and wiring. The work involves laying of underground cables in the duct as well as with clamping arrangements on the walls, supply and fixing of aluminium ladders and supports with 3mm thick phynolic sheet for running t h e cables in t h e relay room. Interconnection shall be carried out with signaling multi core cable (skinned/ unskinned) and power cables as p e r the instructions of Railway representative at site. The w o r k also include termination of the interconnection cables o n 5 0 w a y terminals in t h e relay rack/ control panel, cable termination rack etc. After the interconnection cables are laid, the ducts shall b e filled with M sand and closed. Wherever required the cables shall be taken to o t h e r fl o o r s i n the building b y clamping them on MS angles and flats grouted on the walls.(Supply of interconnection cables i s not included in this schedule).[2BA terminals, Aluminium ladder arrangements using 37mmx37mmx5mm aluminium angles and 25mmx6mm aluminium fl a t s , aluminium supports, phynolic sheet - 3 m m thick for bottom of aluminium ladders, M S angles a n d flats, bolts and nuts, concreting materials, and all other materials required f o r t h e w o r k shall be supplied by the contractor]. b)Provision o f interconnection - more than 5 roads (same floor)
S&T work in connection with the Improvement of the yard under the jurisdiction of SSE(P.way)/PRR in Adra Division.
Excavation of trench in all kinds of soils including soft rocky area and clearing of roots of trees, rocks etc. to a depth of 1 metre and width 0.3 mtr. Track/ Pucca road/Platform crossing/ Level crossing as per SEM Drawing Nos.15-D5 including supply, transportation and laying 3 of DWC pipes (full) with collar(for jointing pipes) Inner diameter/Outer diameter:103mm/120mm to Specification Nos.14830 (Part-2):2001 as per SEM Drawing Nos. 15-D4 and drawing of cable through DWC pipes with collar(for jointing pipes) including back filling and ramming after cable laying as specified in Tech. Circular Nos. 2 of 1988 & 01/2010 issued by CSTE/SER for S&T Cables or any latest guidelines. This includes repairing and plastering of Platform/Pucca road after cable laying. DWC pipes will be inspected by representative of Sr.DSTE/ADRA before use.
"(i) Soft up gradation of SDL, UMR, BRH, BJRI & ABKP station through Amrit Bharat Station Scheme phase-II. (ii) Soft up gradation work of USL, PND & APR stations through Amrit Bharat Station Scheme phase-II. (iii) Development of second entry and modernisation of all platforms along with all alied facilities at Anuppur Railway Station. (iv) Upgradation of all platforms of USL, PND, APR, SDL, UMR & ABKP Railway Stations."
Laying of Quad Cable/PJF cable of Kilometre different sizes, power cable of different size in the excavated trench, inside GL, RCC and HDPE pipes. This includes loading/unloading & transportation of cable from the stores of railway.
UTILITY SHIFTING AT BOTH SIDE OF POLAYATHODU RAILWAY CROSS IN FAVOR OF KRAIL
(926) Excavation of cable trench of appropriate size ( normally 1.2m deep and 0.35m /0.5m wide for single/double run) in all classes of soil including breaking clods, watering, ramming and sectioning of soil bank etc. and back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding laying of cable).