Loading…
Loading…
7,738 results • Best match
Renovation of Biochemistry Laboratory, Department of Biochemistry, Research Block A, PGIMER Chandigarh. (SH Biomedical Work, Civil Work, Electrical Work and HVAC Work) (Composite Work)
Part B: Civil Work
GENERAL-Annual Maintenance works of BAKKIKAYAM Regulator in Vengara Grama Panchayath. Malappuram Dt for the Financial year 2025-26- -General Civil work
OD19224/2025-2026:Charges for maintenance works of Diesel Generator of Bakkikayam Regulator including changing of oil and filters including cost of materials , labour charges etc. complete (on call )
Facility Management Services - LumpSum Based - Replacement of 03 Damaged Store Tin Sheds Shed Flooring Boundary Wall Repair and Height Raising at Electricity Store Centre Ayodhya; Civil Works; Consumables to be provided by service provider (inclusive..
Facility Management Services - LumpSum Based - Replacement of 03 Damaged Store Tin Sheds Shed Flooring Boundary Wall Repair and Height Raising at Electricity Store Centre Ayodhya; Civil Works; Consumables to be provided by service provider (inclusive..
Road
Road renovation-construction of drain
DESIGN, ENGINERING, SUPPLY, CONSTRUCTION OF ALL CIVIL AND MISCELLANEOUS WORKS FOR INFRASTRUCTURE DEVELOPMENT OF 2000 MW RVUN SOLAR PARK INCLUDING WORKS MENTIONED IN TNC-05/2026-27 AT VILLAGE BODANA, TEHSIL- BAP, DIST. - PHALODI (RAJASTHAN)
Supply, laying and commissioning of DI pipe line of 150 mm dia including all civil works, chambers for valves and required ROW from IGNP Intake Pump House to Reservoir near PPS-II and from RWR to CWR, SUMP, OHSR if required as per approved design and drawing.
Repair/Renovation of room number 2/21, G/22, 4/28, 3/22, 3/15 at mini building and room number 3/34, basement 10 and 14 ,1/9 ,2/30, B/14, G/25, G/16, and 1/8 at Main building Civil Secretariat Jammu. CNO-75 NP
Marble work gang saw cut (polished and machine cut) of thickness 16 mm for wall lining (veneer work), backing filled with a grout of 12 mm thick average in cement mortar 1:3 (1 cement: 3 coarse sand), including pointing with white cement mortar 1:2 (1 white cement: 2 marble dust) with an admixture of pigment to match the marble shade (To be secured to the backing by means of cramps, which shall be paid for separately). (Area of slab upto 0.5 sqm)