Loading…
Loading…
8,382 results • Best match
Construction Compound Wall and Providing of Paver Block Work at Shanmugapuram Corportion School in West Zone Ward No 37
... Stainless Valves and Fittings and Float Control etc. The rate should be inclusive of all civil works, wherever necessary to install the System in position and intact.-50LITRES
NEW CONSTRUCTION OF LINK ROAD BHUNDER DHADE ROAD TO GURUDWARA BERI SAHIB
CIVIL WORK
Horticulture Works/ Maintenance of Garden with an item including cutting/ pruning of trees
... (ii) Contractor shall follow the directions for Dust and Pollution Control measures in construction as notified by MoEF&CC / MoHUA / CPWD / BMC or any other statutory authority. (iii) All... statutory authority. (iii) All precautionary measures for control of Air Pollution due to Building Construction Activity shall be taken as per Local Statutory/ Municipal Authority Air Pollution Mitigation ...
Certain repair to OTM Accn in units, Central Institute, APS, FASF, TCP-III and IV under AGE B/R-I at GE Gurdaspur.
... rolling shutters of any type any size and refixing the same in situ after necessary welding work, oiling and greasing, replacement of unserviceable bearings, realignment of anchoring... separately as supply only under appropriate item. (ii) Rates are deemed to inclusive of all civil works required for refixing and making good the disturbed surfaces).
SPL REPAIR TO ROOF TREATMENT OF CERTAIN CRITICAL BLDGS AT AF STN CHANDIGARH UNDER GE (AF) MC CHANDIGARH
Dismantling and reinstalling of Split AC (both indoor and outdoor) after completing paneling/civil work including top up of refrigerant upto desired level for obtaining adequate cooling and including floor/wall mounted outdoor and Indoor stand as per site requirement complete all as specified and directed.
IMPROVEMENT TO PIMPRI DOLHARI ROAD VR 103 JOIN TO ODR93 TOTAL LENGTH 1/350 KM AND 1/500 WITH CONSTRUCTION OF SLAB DRAIN, TQ.- DIGRAS, DIST.- YAVATMAL
CIVIL WORK Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed.