Loading…
Loading…
7,840 results • Best match
MLA-SDF-2024-25 Construction of toilet block at St George UP School Poonithura in Cochin Corporation Division 47-toilet block-General Civil Work
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
Construction of Sewage Treatment Plant Capacity 0.83 MLD and Sewer Network with Allied Civil Work) (Under Used Water Management Component under SBM(U) 2.0).)
Excavation in foundation, trenches etc. in earth work, in all kinds of soil such as pick work, jumper work, blasting work in hard / soft rocks, chiseling / wedging out of hard / soft rocks including dewatering in saturated soil up to all leads and lifts, staking the excavated soil / materials upto all leads and lifts clear from the edge of excavation and then returning the stacked excavated soil in all layers when required into plinths sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as per direction of Engineer -in-Charge.
Construction of Sewage Treatment Plant Capacity 0.50 MLD and Sewer Network with Allied Civil Work) (Under Used Water Management Component under SBM (U) 2.0).
Construction of Sewage Treatment Plant of 0.50 MLD capacity based on MBBR Technology , including evolving of hydraulic & structural designs & drawings, planning, testing and commissioning of treatment facility. The Sewage Treatment Plant should be capable of treating domestic raw sewage having characteristics of BOD =350 mg/litre & suspended Solids =650 mg/litre and the characteristics of treated /disposable effluent should comply with the standards as per the norms of H.P. State Pollution Control Board i.e. PH = 6.5- 9, BOD ≤ 10 mg/litre, COD ≤ 50 mg/litre, TSS ≤ 50 mg /litre, Faecal Coliform (MPN /1000 ml) 100, N - Total N ≤ 10 mg/litre, NH4 - N ≤ 5 mg/litre. The scope of work includes construction of Inlet Chamber (1 No.), Screen Chamber (2 No.), Grit Channel (2 No.), Distribution Box (1 No.), MBBR (Moving Bed Bio Film Reactor), Sludge Drawing Bed , chlorine contact tank with required arrangement, Interconnectivity pipe of STP units & Effluent Pipe for disposal of treated waste, providing and installation of Electro - Mechanic Equipment’s with DMF, coiling & acccess loddor and Plant building , Fencing Panel around the STP yard Steel Gate Lab equipment complete in all respect with in all leads and lifts at site complete in all respect as per the entire satisfaction of Engineer-in-charge (as per chapter No. vi(a), vi(b), vi (c). 3 Months of successful trial run as per the provisions of Manual on Sewerage & Sewage Treatment published by CPHEEO Manual (Latest edition).
Repair Work at Handikunte Panchayat Building and Repair Work at Madalur Panchayat Building and Repair Work at Nadur Panchayat Building and Repair Work at Bevinahalli Panchayat Building and Repair Work at Changavara Panchayat building in Sira Taluk
Repair Work at Handikunte Panchayat Building and Repair Work at Madalur Panchayat Building and Repair Work at Nadur Panchayat Building and Repair Work at Bevinahalli Panchayat Building and Repair Work at Changavara Panchayat building in Sira Taluk
Civil and Electrical Repair of old false ceiling false ceiling in new Chemical and Biotechnology department building conference hall 5th floor and new Metallurgical and Materials department building conference hall dias room 5th floor at NIT Warangal
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Civil works Plumbing works and Electrical works
Civil works