Loading…
Loading…
8,082 results • Best match
Annual Plan-Project No.98/27-Koralad Tractor patha renovation in ward no.10 of Puzhakkattiri GP-General Civil Work
Road Improvement Work
Repairing Work of New D.E.E. Chamber at Karjan, Ta. Karjan Di. Vadodara
progress and completed in all classes of civil engineering construction works
Construction of Toilet Block (PT) Within S.W.M Project at Gate No 1 in Ward No-05 under Bansberia Municipality. (Model No-F Civil Work ) Toilet seats-2 nos and Urinal- 3 nos.
Construction of Toilet Block (PT) Within S.W.M Project at Gate No 1 in Ward No-05 under Bansberia Municipality. (Model No-F Civil Work ) Toilet seats-2 nos and Urinal- 3 nos.
Construction of Toilet Block (PT) Within S.W.M Project at Gate No 3 in Ward No-05 under Bansberia Municipality. (Model No-F Civil Work ) Toilet seats-2 nos and Urinal- 3 nos.
Construction of Toilet Block (PT) Within S.W.M Project at Gate No 3 in Ward No-05 under Bansberia Municipality. (Model No-F Civil Work ) Toilet seats-2 nos and Urinal- 3 nos.
Renovation of Second Floor for New Examination Hall at Academic building of Murshidabad Medical College and Hospital- Civil works.2nd call
Renovation of Second Floor for New Examination Hall at Academic building of Murshidabad Medical College and Hospital- Civil works. 2nd Call
Civil Maintenance/ Renovation work in Hostel and Department in Zone B at IIT Roorkee
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done.