Loading…
Loading…
8,118 results • Best match
Construction of Toilet Block (CT) at Bansberia Football Ground Beside Pratap Sangha Club in Ward No-06 under Bansberia Municipality. (Model No-F Civil Work ) Toilet seats-2 nos and Urinal- 3 nos.
Construction of Toilet Block (CT) at Bansberia Football Ground Beside Pratap Sangha Club in Ward No-06 under Bansberia Municipality. (Model No-F Civil Work ) Toilet seats-2 nos and Urinal- 3 nos.
Demolition of existing old Control room, Foundation, Chain-link fencing, CW & Construction of New C.R. Building (F.F. Level), foundation, cable trench, compound wall, RCC road & ancillary civil works on pile foundations at 66kV Bhatpore (Green) S/S, Tal. Choryasi & Dist. Surat and 2 Nos of Opposite end feeder bays at 220kV Ichhapore SS under Navsari Circle.
CIVIL WORK
Civil Work Labour for site clearance and scrapping old paint etc. all complete job.
MP-LADS-25-26 Hon MP Shri. MK Raghavan - Construction of Parappara Sivaji Centre Ayikkodumala Road in Ward-14 of Kizhakkoth GP-In Koduvally BP-General Civil Work
3.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
Civil Water - Water Works
Labour charge for dismantling/ repairing of 150mm/200mm valve providing gasket, packing and fitting etc. complete. (ANNEXURE XVII)
Building Work/ Building Maintenance Work/ Building Renovation Work
31 Guidelines for Air Pollution mitigation (i) The charges for the Air Pollution mitigation measures shall be borne by the contractor without any extra cost to the department. (ii) Contractor shall follow the directions for Dust and Pollution Control measures in construction as notified by MoEF&CC / MoHUA / CPWD / BMC or any other statutory authority. (iii) All precautionary measures for control of Air Pollution due to Building Construction Activity shall be taken as per Local Statutory/ Municipal Authority Air Pollution Mitigation Plan. (iv) Mandatory Form for Building Construction activity to control Air Pollution along with supporting documents and site photographs shall be submitted to concerened authority or uploaded on online portal. (v) Projects attracting Environmental Clearance shall carry out Third Party Ambient Air Monitoring every fortnightly from NABL / MoEF&CC laboratory.