Loading…
Loading…
8,248 results • Best match
Civil Work
R.C.C. work with M-20 grade In Different Works having minimum compressive strength in work test of 200 Kg/Cm2 at 28 days using 20 mm and down graded size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering and laying concrete and compacting by using vibrators watering, curing for 28 days, centring & shuttering and finishing the exposed surface smooth providing grooves or beads where necessary in all floors including cost, conveyance, royalties and taxes of all materials , cost of all labour with cost of all T&P required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or steel & binding wires and labour charges for strengthening, cutting, bending grills and placing in proper position.
Civil Work
Construction of Brick Masonry Drain at Daspara,Ward No-09
Civil Work
Construction of Concrete Drain at Kalkati,Ward No-05
Civil Work
Construction of Brick Masonry Drain from H/o- Samir Guha towards Daspara Shiv Mandir,Ward No-09
Civil Work
Construction of 03 Nos of Culverts in different locations,Ward No-04
Civil Work
Construction of Brick Masonry Drain at Rahman Nagar, Imlitala, Bali Bastee,Ward No-04