Loading…
Loading…
8,182 results • Best match
GENERAL Urgent rectification and water proofing works to the roof slab of Academic block in Govt Polytechnic college Neyyattinkara Special repairs General Civil Work
14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand)
CIVIL WORKS
Rigid and smooth centering and shuttering for R.C.C. work including false works and dismantling after casting – Foundation & Plinth Beam
CIVIL WORKS
Rigid and smooth centering and shuttering for R.C.C. work including false works and dismantling after casting – Foundation & Plinth Beam
CIVIL WORKS
Rigid and smooth centering and shuttering for R.C.C. work including false works and dismantling after casting – Foundation & Plinth Beam
CIVIL WORKS
Civil Works Earth work in excavation of foundation in all kinds of soil with in 1.5m initial lift including dressing and leveling of bed and breaking the clods and the excavated materials with in 50m initial lead as per direction of Engineer in charge.
ROOF TREATMENT AND PLASTER REPAIR OF SPECIAL REPAIR WORK AND OTHER MISCELLANEOUS CIVIL WORKS AT 33/11 KV S/S KIRAWALI (IPDS), AGRA DISTRICT.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (DSR 10.25) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (DSR 10.25.2)