Drainage work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br>
11760-2026 General -Ksmart file no 775479-2026 Step Junction road renovation in Nalanchira ward-1-General Civil Work
11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth
Repairs To Distillary Office Building At Dharampur Ta- Dharampur Dist: Valsad
All works shall be carried out as public works department Handbook and other
Restorative repairs in Deepvihar Higher Secondary School Building at Headland, Sada
Execution of day to day works by supply of high skilled artisans like Carpenters, masons for works of restorative repairs, aluminium doors and window repairs, shutters and gate repairs etc as directed, with tools for a period of 8 hours per day as and when required etc complete
SPECIAL REPAIRS FOR ROOF TREATMENT OF MAIN OFFICE BUILDING CDA, CHENNAI
Cleaning and preparation of newly plasteres roof surfaces and applying the water proofing treatment as under (a) Applying 1st course of bituminious (oil based) primer confirming to IS-3384 the screed bed 0.4 lit/sqm over (b) Applying 2nd course of a coat of binding material with blown type bitumen of grade 85/25 heating to working temperature of 180 0 C and applied @ 1.2 kg/sqm. (c) Applying 3rd course of APP (Atactic polypropylene) based polymeric membrane minimum weighing 3.6 kg/sqm and minimum 3 mm thick reinforced with polyster non wove fabric (wt not less than 150 gms/sqm) laid with 75 mm side overlap and 100 mm overlap by forced / torch application as per manufactures instructions. (d) Applying 4th course of a coat of bonding material with blown type bitumen of grade 85/25 heating to working temperature of 180 degree C and applied @ 1.2 kg/sqm over APP membrane, (e) Applying 5th course of a one coat of solar reflective aluminium paint 0.10 Litre/Sqm on roof surfaces complete all as specified and directed
REPAIR OF RESIDENTIAL BUILDING AND COURT BUILDING UNDER PWD (B/R) SUB DIVISION BARHI
REPAIR OF RESIDENTIAL BUILDING AND COURT BUILDING UNDER PWD (B/R) SUB DIVISION BARHI