Loading…
Loading…
8,450 results • Best match
ROOF TREATMENT AND OTHER MISC. CIVIL WORK AT 33/11 KV. SUB-STATION ALOOMANDI, KESCo KANPUR.
Civil work:
Electrical Work Project No S0343 25 Construction of Sub Centre Building in Vallapuzha Grama Panchayath VALLAPUZHA WELLNESS CENTRE Construction of Sub Centre Building in Vallapuzha
OD356836/2025-2026:Fabrication, supply & installation of dust and vermin proof, wall mounting, thermoplastic meter box of size not less than 400mm(length), 300mm(width) and 190mm(depth)(Make- Sintex/Hensel), Sheet thickness 5mm) suitable for fixing KSEB Single Phase SMART Energy METER, space for CT etc, hinged door construction for the front side with compartments if necessary, providing 3nos 32 A BS type HRC fuse unit with HRC fuse link, 32A neutral link, vision panel for the meter compartment, knock out for cable entry and exit
Internal and external repair and painting works of AGP Annexe Building and P/f of Roller blinds at AGP Annexe Building and other Academic Buildings at IIT (ISM) Dhanbad
Estimate cost of work as per Section 8 of NIT
The estimate includes provisions for repairs to plastering, painting, enamel painting, construction of a platform for loading and unloading, provision of new sheet-roofed toilets, santiary ditting, plumping etc.
Repairing & Painting
Custom Bid for Services - SITC of Electromechanical Boom Barrier along with associated works like installation of CCTV camera, providing and installing of Prefabricated Security Cabin with associated electrical & civil works and Post Warranty CAMC of.. Similar Category Support Services
providing and installing of Prefabricated Security Cabin with associated electrical & civil works and Post Warranty CAMC of.. Similar Category Support Services
GENERAL-Budget 2024-25 (Substitution Work) Improvements to Pinattinmukal - Thiruvattoor Nagarbhagom Road-By providing 40 mm Chipping carpet-General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)