Loading…
Loading…
8,487 results • Best match
The estimate includes provisions for repairs to plastering, painting, enamel painting, construction of a platform for loading and unloading, provision of new sheet-roofed toilets, santiary ditting, plumping etc.
Repairing & Painting
Custom Bid for Services - SITC of Electromechanical Boom Barrier along with associated works like installation of CCTV camera, providing and installing of Prefabricated Security Cabin with associated electrical & civil works and Post Warranty CAMC of.. Similar Category Support Services
providing and installing of Prefabricated Security Cabin with associated electrical & civil works and Post Warranty CAMC of.. Similar Category Support Services
GENERAL-Budget 2024-25 (Substitution Work) Improvements to Pinattinmukal - Thiruvattoor Nagarbhagom Road-By providing 40 mm Chipping carpet-General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
GENERAL-Budget 2025-26 (Substitution Work) Improvements to Vendar Madathikkala Road-By providing BM 40 mm Chipping Carpet-General Civil Work
4.1.B.2:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-VI - For sub-base cum drainage layer - Mix in Place Method
GENERAL Methurumba Chapparapadavu Kutoor Road Providing drain and side protection work between KM 15/300 to 15/800 General Civil Work
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
Construction and testing of piles for Simulator Building of NAPS.
WORK EXPERIENCE Work 1 Work 2 Work 3 Work 4 Work 5 Work 6 Work 7 Work 8 Work 9 Work 10