SSE (W) Akola Jurisdiction - Proposal for Provision of Heavy repairs to Platform surface , Drainage system, water supply, Cover shed of Service building and Platform at Akola railway station.(Rev : 2026-27)
14.0 REPAIRS TO BUILDING
Annual Zone work for PE 30/6/2026 for repair to service building & station building in the section of JE/Yamuna Bridge & SSB in the section of SSE/W/DLI/Line under ADEN/DLI.
Hiring of Hydra in good working condition Hour for fixing and erecting of precast RCC column and panel as directed by EIC with contractor labour, driver , fuel etc. Payment shall be made for actual working hour at site
Facility Management Services - LumpSum Based - Solution to sewage problem in Sector-5 power substation; Civil Work; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Solution to sewage problem in Sector-5 power substation; Civil Work; Consumables to be provided by service provider (inclusive in contract cost)
GENERAL-Venneli PadasekharamConstruction of box culvert infront of motorthara in Venneli Padasekharam in Nedumudy Panchayath in Kuttanad TalukGeneral Civil Work
OD41594/2025-2026:Putting up ring bund of top width 1.50m, bottom width 2.75m.and average height of 2.50m with 1:1/4 side slope and protect the sides with coconut post of 4.50m long driving down 2.00m below bed level at 75cm c/c, providing 3 rows of weiling pieces 1/4 split coconut post on both sides and 1/4 split cross ties to alternate posts at top, bottom and middle portion and screening the sides of bund with Seperation memebrane of impermeable plastic sheet 125 micron thick fixed properly using coconut post and weiling pieces using reeper and nails in full height including tying properly using iron wire and coir altogether and supply and filling inside with hard clay/cut earth up to 2.50m, levell and conveyed with all leads and lifts including consolidating properly and maintaing the bund till the work is completed and dismantling the bund after completion of work etc. as per the directions of departmental officers at site.
The proposed project involves the reconstruction of a small stretch of the retaining wall, painting of building, interlocking tile paving, and other repair works for the staff quarters building at the Thommankuthu Eco Tourism Centre.
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
Annual Plan-CLRA GP Pr. No. 275/25-26 Kayiliad No. 26 anganvadi maintenance-Kailiyad Number 26 anganvadi Maintenance-General Civil Work
Work Name:Annual Plan-CLRA GP Pr. No. 275/25-26 Kayiliad No. 26 anganvadi maintenance-Kailiyad Number 26 anganvadi Maintenance-General Civil Work