Loading…
Loading…
7,615 results • Best match
Construction of Various New Anganvadi Building at Village: (1).Vamaj-4 (2).Vadavi-1 (3).Thol-5 (4).Lunasan-1, Ta-Kadi, Dist-Mehsana.
Construction of Various New Anganvadi Building at Village: (1).Vamaj-4 (2).Vadavi-1 (3).Thol-5
Construction of Various New Anganvadi Building at Village: (1).Gambhu-1 (2).Modhera-5 (3).Delvada-1 (4).Shankhalpur-4, Ta-Becharaji, Dist-Mehsana.
Construction of Various New Anganvadi Building at Village: (1).Gambhu-1 (2).Modhera-5 (3).Delvada-
CONSTRUCTION OF INDULAL YAGNIK COMMUNITY HALL AFTER DEMOLITION OF OLD HALL BUILDING AT F.P.NO. 192, T.P.S.NO. 12 (ASARVA EXTENSION SOUTH ) IN BAPUNAGAR WARD, NORTH ZONE, AHMEDABAD (RE-INVITE)
Misc. Civil Work like Wall jari , Civil cutouts
DR retaining wall is proposed at Nathalloor Maakkeel Thommacheri thodu at ward No 4 of Karukachal panchayath.
OD50634/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding ...
Improvement to Right Bank bund road
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
Construction of State Environment Impact and Assessment Authority (SEIAA) at plot no. IP8 Sector 5B, MDC, Panchkula Construction of State Environment Impact and Assessment Authority (SEIAA) at plot no. IP8 Sector 5B, MDC, Panchkula
... structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including: (a) Structural analysis and design and preparation... fixing structural glazing system rigidly to the RCC/ masonry/structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon separator to prevent bimetallic ...