Loading…
Loading…
7,505 results • Best match
Construction of a new classroom building in the premises of the Government Boys Higher Primary School in Minchanal Village of Vijayapur Taluk (2022-23th Pradhan Mantri Adarsh Gram Scheme) (For SC Bidders)
Construction of a new classroom building
Wiring
... interlock and pad locking arrangement of the following ratings on existing angle iron frame work or directly to wall using necessary bolts & nuts, fixing the unit to wall, making good ...
Road
... sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor ...
Consultancy Services for Design, Survey, Detailed Project Report Preparation,Tender Document Preparation and Supervision for Construction work of Tailing Dam /Tailing Storage Facility located behind GSF building at Jhamarkotra Mines, Udaipur
... preparation of Detailed Project Report (DPR), preparation of bid document for award of construction work of tailing dam/tailing storage facility ,Assisting in tendering for selection of construction contractor, review of bids submitted for finalization of contract etc. for construction ...
Construction of connecting approach road with paver block from Street No 3333 main carriageway to NBCC building existing Entry Exit gate including some surface dressing work in AA III Newtown Kolkata
Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade... cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (v) Grading – V
Providing Comprehensive Architectural and Engineering Consultancy Services for Construction of Two-Section School Building and Development of other Facilities at Kendriya Vidhyalaya at GC, CRPF, Chakiya Distt Chandauli, UP on QCBS based