Loading…
Loading…
7,506 results • Best match
Construction of New Integrated Terminal Building and Associated works at Vijayawada Airport Balance Works SH Appointment of Independent Facade Consultant IFC for Quality Audits of Facade system work at NITB Vijayawada airport
Providing independent facade consultancy services as mentioned in the scope of services of IFC for the work of Construction of New Integrated Terminal Building and Associated works at Vijayawada Airport, (Balance Works) at Vijayawada Airport.
Providing & Fixing Chainlink Fencing Including Civil Work on Existing Road Divider From Jolly Party Plot Junction (Udhna-Magdalla Road) to Chai -Bike Junction (Vip Road) in D.T.P.No.29 (Rundh-Vesu-Magdalla) & P.T.P.No-07(Vesu-Magadalla) in South West (Athwa) Zone.
complete including cost of form work but
Sub Head Survey, Investigation, Design and Construction of 3.56 MLD capacity STP based on SBR technology as per latest CPHEEO manual with tertiary treatment so as to achieve discharge standard prescribed by NGT, C/o Lab building, Supply an installati
Survey, Investigation, Design, & Construction of 3.56 MLD capacity Sewage Treatment Plant based on SBR technology as per latest CPHEEO ...
SPECIAL REPAIR RENOVATION ADDITION AND ALTERATION WORKS AT RXI BUILDINGS RXII BUILDINGS MESSII TRAINING CENTRE LABORATORY ROOM AND STORE ROOM OF TRAINING CENTRE AT ARC CHARBATIA
S&F Anodised aluminium snap grid frame work for celling Size of grid 605X605mm. (i) Aluminium sections incorporated in frame work shall conform to IS 733, IS 737 and IS 1285. (ii) The snap grid consist of anodized aluminium... anodized aluminium main/cross tee of size as indicated.(b) Workmanship:- (i) Snap grid frame work shall be fixed to ceiling with supporting hanger consisting of 6mm dia mild steel rod, ...
Construction of nala work from new basti via prathmik school via kanodiya building back side to gav exit upsidc nala to joint paint factroty pal mohalla Under Ward-72 Zone-5
Mild steel of iron work in plane workforcedment concret or reinforsment brick work (when not included inoverall rates) WROUGTH to required shape as necessery including binding for proper complaction of the work and including supply of steel its wastage bend hooks and authorized overlapping shall be measured up to floor two level/(Over all Rate) 12mm to 32mm tor
Renovation of Squash Court
Painting on G.S. sheet with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Old work (one or more coats) i/c the cost of the ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works