Loading…
Loading…
8,359 results • Best match
CERTAIN REPAIRS TO PLUMBING, SANITARY, JOINERY, OTHER CIVIL WORKS AT OTM ACCN COD AND MDC AT MALAD COMPLEX UNDER GE (N) SANTACRUZ MUMBAI
Material and labour for Building up the profile of structural members by using polymer modified mortar upto 20mm average thickness including levelling profiling work rate including following all process with material :- (a) Surface preparation of existing concrete components including grinding/rubbing carefully by grinder without damaging the existing concrete and debris removed outside MD area. (b) Providing & applying rust cleaner to existing corroded reinforcement of approved make (c) Providing and applying two coat of anticorrosive epoxy phenolic rebar protective system to existing as well as new reinforcement (d) Priming cum bonding coat of two component peroxide resin confirms to ASTM-C-882-91 including providing and inserting 10 mm mild steel shear key bars (minimum 3 nos per sqm), shear key fixing with drilling and epoxy grout wherever required, Scaffolding at any height & mixing, laying, levelling and finishing including curing and work shall be execute as per manufacturer instruction and from authorised applicator complete all as specified and as directed by Engineer-in-Charge. Note : All materials should be approved make such as Dr Fixit, Fosroc, Sika, Krishna conchem or equivalent.
Construction of New Su-swasthyakendra (Civil and Electrical Works) at Battala SC, Khejuri-II block under Nandigram HD
Construction of New Su-swasthyakendra (Civil & Electrical Works) at Battala SC, Khejuri-II block under Nandigram HD.
Construction of all technical civil works for new 66 KV Sub-Station Dhandoli Kalan, Under Op. Circle Sangrur
Construction of all technical civil works for new 66 KV Sub-Station Dhandoli Kalan, Under Op. Circle Sangrur) . , AGAINST TENDER ENQUIRY NO. 06/CWC/2026-27 ON THROUGH RATE BASIS EXCLUDING THE COST OF CEMENT AND FOUNDATION BOLTS BUT INCLUDING TOR STEEL , ALL STRUCTURAL STEEL & OTHER STEEL ITEMS.
Facility Management Services - LumpSum Based - Site Levelling Interlocking 30 mtr Drain Construction and One Water Harvesting System Work at 33 11 kV Substation Sector 3 Vrindavan Lucknow for Waterlogging Prevention; Civil Works; Consumables to be pr..
Facility Management Services - LumpSum Based - Site Levelling Interlocking 30 mtr Drain Construction and One Water Harvesting System Work at 33 11 kV Substation Sector 3 Vrindavan Lucknow for Waterlogging Prevention; Civil Works; Consumables to be pr..
REPAIR/MAINT OF SMALL FIRING RANGE AND CIVIL WORKS AT AF STN SINGARSI UNDER AGE (I) AF STN SINGARSI
30395-2024 Annual Plan Valyathura Govt UPS Kavadam Construction- and Interlocking Civil Work
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works