Loading…
Loading…
8,253 results • Best match
Construction and Renovation of School of Eminence at Gurdaspur under Head 4202 For the year 2026 2027
... (150 Km/hr-170 Km/hr) Complete in all respect with transportaion, fabrication, labour & Civil Work etc Features :- 1. Solar PV Module warranty 25 Years & certified under IS/IEC 61730 I... Theft of the Material) 5. Annual Maintenance contract for the period of 10 Years #The work will got done from approved MNRE (Misitry of New and Renewable Energy)/ PEDA (Punjab ...
Renovation, alteration and modification of washroom (Ladies & Gents) at 1st floor, MOB RBI, Guwahati
Estimate for Rehabilitation, Renovation Modernization of Nurdin Minor from RD 13420 to 30000 Tail
Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing, removal of stumpsand other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil,Mechanical Means,Depth upto 3 m
Estimate for Rehabilitation, Renovation Modernization of Bath Minor from RD 20886 to 45660 Tail
Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing, removal of stumpsand other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil,Mechanical Means,Depth upto 3 m
SPECIAL REPAIRS RENOVATION OF BOUNDARY WALL AT KV WELLINGTON PHASE-II UNDER GE WELLINGTON
... Material and Labour for Conducting routine (Vertical load test, lateral load test) on working pile in accordance with relavant IS code including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc including necessary T & P complete ...
Renovation of External Water Supply pipe line at BHQ of 10th Bn ITBP Kimin
Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge : 15mm to 40mm Nominal Bore