Loading…
Loading…
8,548 results • Best match
REPAIR TO ROOF TREATMENT AND OTHER ALLIED WORKS SERVICES AND REPAIR/MAINT CERTAIN BUILDINGS AND INSTALLATION AT CHAFB
Demolition brick work or stone/ boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stone work and precast concrete articles complete as specified and directed.
Execution of Earthwork Minor Bridge Supply of Point and Xing P Way Fittings Supply and Spreading of track ballast execution of P Way works and other allied works in connection with Renovation of track and OHE at Govinda Siding of Jamuna Kotma Area
Third or subsequent Through Packing of track for all sleeper density including picking of slacks, as required after second through packing, subsequent to Deep Screening work as per procedure prescribed in latest edition of IRPWM. This item can also be used after lifting/regrading/realignment works also. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.
MPS DEVSAR CHUNGI BHIWANI TOWN Construction of 21 00 MLD MPS with peak factor 2 25 and Renovation of existing MPS IPS including Pump chamber Boundary wall Staff quarter Installation of pumping machinery Rising main line D G set and Electric transfo
MPS 21.00MLD: Design, construction, testing and commissioning of MPS suitable for 21.00MLD average flow with peak factor 2.25complete in all respect as per scope of work and specifications mentioned in DNIT and entire satisfaction of engineer-in-charge including ...
Est.No. SR/MESD/ MLA /1925 1926 / 2024-25 (A) Providing renovation to Split Air-Conditioning System in Mini Audiotorium, New Cyber Lab Room No- 06, UG LAB Cyber, Exam Room No-54, Conferenace Room No-04, Library, Physics staff room HOD, Reasearch La
Est.No. SR/MESD/ MLA /1925 & 1926 / 2024-25 (A) Providing renovation to Split Air-Conditioning System in Mini Audiotorium, New Cyber Lab Room No- 06, UG LAB... Instrumentation LAB at Forensic Science College Madam Cama road Colaba Mumbai. (B) Providing Renovation to Exisitng Old Outdated Internal Electrical Installation System installed at the Foreinsic ...
Repair, renovation of Ground, First and Second floor of HRBC Bhawan for relocation of existing office setup i.c.w. setting up Enquiry Commissions in 3rd, 4th and 5th floor of HRBC Bhawan at Munshi Prem Chand Sarani, Kolkata 700021_Civil and S P Work
Constructing Inspection pit of inside measurement 600mm X 600mm X upto 600mm (depth) with 250 mm thick 1st. class brick work in cement mortar (1:4) on all sides, bottom of the pit consisting of 100 mm thick cement ...
Decongestion of Hansua D/C (0.00 Km to 48.00 Km) Alaka D/C, Tigiria D/C, Haladipani D/C, Santara D/C. Telugunia D/C, Basulei D/C and Renovation of link drains of Basulei D/C under Kujanga and Erasama Block
Earth work in excavation of drain both in dry and wet conditions by mechanical means in all kind... complete including taxes, labour cess T&P etc complete with all cost incidental to the work as per the drawing specification and direction of the Engineer-in-charge. (Measurement ...