Loading…
Loading…
8,580 results • Best match
To develop a Comprehensive integrated scheme of water supply arrangement through pipeline network and related electrical and mechanical of Line-10 and Derawal Nagar to R K Ashram Marg section of Line-8 Ext. of Delhi MRTS Project of Phase-IV.
Sub-Head A1: Pipeline and Distribution Works (Civil Works-NDSR Items) (1 Nos)
E.L.D.C.No./SMII/P5/2230/2026 Removal And refixing of 6 kWp solar rooftop panel at I block 5th street and 3kWp solar rooftop panel at Chennai primary school, TV nagar Vinayagar kovil street, Thirumangalam, div 104, zone 8
Cost of Dismantling and assembling at requisite site,civil work if required any,Supply of DG cabling required for site,Cable and other electrical accessories required for 1 KW Installion at site,Labour Charges for Erection,Installation and Comissioning as per technical specification
Replacement of old/damaged sewer line by static pipe bursting method near D-39 NDSE II under EE(C)-29/SE(C )-11.
Replacement of pipelines through hydraulic /static pipe bursting process I/C making of bursting tool entry pits , Exit pit ,all related civil works for site preparation , like excavation shoring/strutting maintaining the pits , traffic management etc. For300 To 375- mm dia.
WBPHED/EE/JD/e-NIT- 09/2026-27 (Sl.No.03)
... installations, including Iron Elimination Plants with allied equipment, distribution networks, mechanical and electrical components associated with pump-motor sets, water purification ...
PERIODICAL SERVICES TO BUILDINGS AT STN HQ CAMPUS AREA STN OFFRS MESS MH ECHS MDC AREA MES OFFICE OTHER ACCN AND REPAIR AND REPLACEMENT TO MISC BR WORKS IN THE AREA OF STN HQ CAMPUS AREA STN OFFRS MESS DET SIG CMP DET MES YARDS INSTALLATIONS FILTRATI
... required for preparation of surface are deemed to be included in the rates quoted. (ii) The work must be got executed through authorised applicator of manufacture after concluding an ...
Construction of Skywalk under PPP Model on Design, Build, Finance, Operate and Transfer (DBFOT) with Fixed Concession Period of 15 years under Commercial Advertisement rights at Varthuru to Old Airport Road Opp. Sai Samruddi Apartment / Vibgyor School Cross Junction(General Category)
Construction of Skywalk under PPP Model on Design, Build, Finance, Operate and Transfer (DBFOT) with Fixed Concession Period of 15 years under Commercial Advertisement rights at Varthuru to Old Airport Road Opp. Sai Samruddi Apartment / Vibgyor School Cross Junction