Loading…
Loading…
95,188 results • Best match
Annual Plan-DPK 1054/26-THRIKKODITHANAM DIVISION CONSTRUCTION OF COURT GHSS THRIKKODITHANAM-General Civil Work
... Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building , for all heights and all levels etc. including: a) Structural analysis & design... The item includes cost of all material, labour component and scaffolding . Base frame work for ACP cladding is payable under the relevant aluminium and GI items. The Contractor ...
MLA-SDF-2025-26 Olive Gardens road Construction-in ward 14, Vazhapplly GPGeneral Civil Work
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
Annual Plan CHEKKIAD GP 2025 2026 P 112 CONSTRUCTION OF MCF CONTAINER General Civil Work
CONSTRUCTION OF MCF CONTAINER
Annual Plan-Pangode GP Pro.No.250/2025. Verandha construction at Homeo Hospital-General Civil Work
Annual plan 202526 VORKADY GP PRO 64 construction of compound wall FHC General Civil Work
... Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building , for all heights and all levels etc. including: a) Structural analysis & design... individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the ...
Annual Plan-Kottiyoor G P 296/25-26-Construction of Alphonza DWS-General Civil Work
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil