Loading…
Loading…
94,630 results • Best match
Annual Plan-S1023/26-VATTAKANDAM SC NAGAR ROAD CONSTRUCTION ON WARD NO 46-General Civil Work
Annual Plan-KODIYATHUR GP PROJECT NO 370/26-Construction of Parapuram Smashanam Road-General Civil Work
3.3:Construction of Embankment with Material Obtained from Roadway Cutting <br> Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
GENERAL-2025-26-CDLM GP-CONSTRUCTION OF MCF-PROJECT NO 195/2025-26-General Civil Work
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Annual Plan- PROJECT NO 369/26- KODIYATHUR G.P-CONSTRUCTION OF ALINGAL KUNNATH ROAD-General Civil Work
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
Annual Plan-CHOKLI GP Pro No 275/2025-26 CONSTRUCTION OF CRUSHER ROAD- General Civil Work
3.15.2:Compacting Original Ground<br> (ii) Compacting original ground supporting subgrade<br> Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
Annual Plan-Kunhimangalam GP- Project no 157/25-26-Construction of Bottle booths General Civil Work
10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes