Special Repair work on Court Room No. 18 and 19 at District Court Civil Line Satna, Under Sub Division Satna
eProcurement System Government of Madhya Pradesh Created By: Mohammad Nadeem Siddiqui Created Date/Time: 09-Jun-2026 01:22 PM Tender Title: Special Repair work on Court Room No. 18 and 19 at District Court Civil Line Satna, Under Sub Division Satna Tender ID: 2026_PWDRB_508477_1
Construction of Post Martum Building at Civil Hospital Nalkheda District Agar Malwa (M.P.)
eProcurement System Government of Madhya Pradesh Created By: Arvind Kumar Gaur Created Date/Time: 22-Dec-2025 04:32 PM Tender Title: Construction of Post Martum Building at Civil Hospital Nalkheda District Agar Malwa (M.P.) Tender ID: 2025_DHS_459410_1
New construction work (Civil and Electrical) of Digha Health (HWC) Centre (Type-B) under Nakashipara Block.
1.00 HAZRA CONSTRUCTION (GSTN-19ABHPH1187M1Z9) BID ID -8214859 5512829.00 2.99 5677662.59 Fifty Six Lakh Seventy Seven Thousand Six Hundred and Sixty Two
LAC ADS PHC KUMMIL Construction of Administrative block for PHC Kummil vertical extension General Civil Work
... laying in position machine batched and machine mixed design mix M-30 grade cement concrete work, using cement content as per approved design mix, including pumping of concrete to site ...
Annual Plan-Construction of Injapathal Panamkutty Road-pro no 202/26 ward 15- General Civil Work
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
AMRUT-Construction of Retaining wall for 800 mm DI pipeline side protection -Amrut- General Civil Work
11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth