Loading…
Loading…
95,247 results • Best match
STRUCTURAL REPAIRS TO VARIOUS BLDG INCLUDING REMOVAL OF VEGETATION FROM STRUCTURAL MEMBERS CERTAIN MISC CIVIL WORKS AT SPDC, WED, DSRV NSD MKD AREA UNDER GE (NW) MANKHURD.
M&L for structural repairs to columns, beams, slabs and chajjas at maximum height of 16 mts including scaffolding... in following steps as mentioned below 1) Chipping , Removing,Carefullly Loose Concrete work by low impact Hammer/Breakar without damaging the structure & cleaning and disposal of ...
General repair maintenance work Civil Carpentary Plumbing Aluminium water proofing of Trikuta Kailash Nilgiri Vindhyanchal Basohli Boys hostels administrative block and Matrika Auditorium at SMVDU Campus Kakryal Katra
All items covered by the J&K Schedule of Rates , 2022 under Basic Rates, Building work and Services (Civil work, Aluminium work Carpentary work, Plumbing work, water proofing, painting work etc.)
Construction of 08 no additional class room and other civil work including internal electrical work at Govt. H.S.S. Bhojpur (UDISE Code 23300504207) distt. Rajgarh.
Construction of 08 no additional class room and other civil work at Govt. H.S.S. Bhojpur (UDISE Code 23300504207) distt. Rajgarh.
Stock storage under Jal Shakti Division Jubbal Distt Shimla HP SH Various civil repair works at the Executive Engineer residence at PWD colony
Excavation in foundations , trenches etc., in earth work , lift up to 1.50 metres. Stacking the eacavated soil not more than 3 metres clear from... disposing off all excavated soil as directed with in the load of 20 mtrs. Pick and Jumper work etc. complete as per the direction of the Engineer - in - Charge.
Deposit-RIO Office Renovation Cubicle work Civil work
15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm
Idukki Development Package-Construction of Pathinaraamkandam Prakash Road b/w Ch.4/400 to 4/560 -work-General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)