Loading…
Loading…
95,216 results • Best match
GENERAL-Annual plan 2023-24- Thrissur District- Construction of new building for Govt. Ayurveda hospital,Guruvayur - Phase 1-Work- General Civil Work-1
Annual Plan-2025-26/PYM/PRO.283/26 PEELARMUZHI KOTTAMALA ROAD DRAIN CONSTRUCTION -WARDNO.08,PARIYARAM GP,CHALAKUDY BPGeneral Civil Work
Work Name:Annual Plan-2025-26/PYM/PRO.283/26 PEELARMUZHI KOTTAMALA ROAD DRAIN CONSTRUCTION -WARD-NO.08,PARIYARAM GP,CHALAKUDY BP-General Civil Work
Annual Plan-141/25-26-Construction of Toilets in Schools in Various Divisions Second phase-General Civil Work
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
Annual Plan PR NO 239 26 KALPETTA MUNICIPALITY CONSTRUCTION OF FOOTPATH AT PADAPURAM KOONAMMEL NAGAR General Civil Work
Annual Plan-project no.257/26 Construction of Pareli road in ward 2-kanjoor gp-General Civil Work
GENERAL NIP Sabarimuttam Construction of Cut And Cover in Sabarimuttam field Canal near ch 1250m General Civil Work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil