Loading…
Loading…
8,117 results • Best match
Civil Work Related to Construction of CT Foundation after CB Foundation in 132 KV Yard and Construction of 33 KV CT Foundation in 13 No 33 KV Bay at 220 KV Sub Station Basti
Civil Work Related to Construction of CT Foundation after CB Foundation in 132 KV Yard and Construction of 33 KV CT Foundation in 13 No. 33 KV Bay at 220 KV Sub Station Basti.
Repair Work at Handikunte Panchayat Building and Repair Work at Madalur Panchayat Building and Repair Work at Nadur Panchayat Building and Repair Work at Bevinahalli Panchayat Building and Repair Work at Changavara Panchayat building in Sira Taluk
Repair Work at Handikunte Panchayat Building and Repair Work at Madalur Panchayat Building and Repair Work at Nadur Panchayat Building and Repair Work at Bevinahalli Panchayat Building and Repair Work at Changavara Panchayat building in Sira Taluk
Repair Rehabilitation on and up gradation of IPS at Transport Nagar (Reta Bajri) and Kishanpura disposals including Civil Works, RCC Structures, DI K-9 Pipeline, CI Specials, Pumping Machinery and installation of 82.5 KVA Genset under Zone 7
Repair Rehabilitation on and up gradation of IPS at Transport Nagar (Reta Bajri) and Kishanpura disposals including Civil Works, RCC Structures, DI K-9 Pipeline, CI Specials, Pumping Machinery and installation of 82.5 KVA Genset under Zone 7 (1 Work)
Retender NABARD - RIDF XXX - PEROOR THELLAKOM PADASEKARAM- CONSTRUCTION OF PUMP HOUSE AND PARAKKUZHY AT PEROOR THELLAKOM PADASEKARAM, ETTUMANOOR KRISHI BHAVAN, KOTTAYAM-General Civil Work
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
MLA-SDF-2024-25 Construction of toilet block at St George UP School Poonithura in Cochin Corporation Division 47-toilet block-General Civil Work
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
Construction of Sewage Treatment Plant Capacity 0.83 MLD and Sewer Network with Allied Civil Work) (Under Used Water Management Component under SBM(U) 2.0).)
Excavation in foundation, trenches etc. in earth work, in all kinds of soil such as pick work, jumper work, blasting work in hard / soft rocks, chiseling / wedging out of hard / soft rocks including dewatering in saturated soil up to all leads and lifts, staking the excavated soil / materials upto all leads and lifts clear from the edge of excavation and then returning the stacked excavated soil in all layers when required into plinths sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as per direction of Engineer -in-Charge.