Loading…
Loading…
8,432 results • Best match
CIVIL WORK
Earth Work Excavation in hard soil within initial lead and lift including rough dressing and leveling as per the direction of the engineer
CIVIL WORK
Earth Work in excavation of foundation in hard soil within initial leads of 50m & lifts of 1.5m including dressing and leveling of bed etc and adding contractor's profit and over head charges etc. complete in all respect
CIVIL WORK
Earth Work in excavation of foundation in hard soil within initial leads of 50m & lifts of 1.5m including dressing and leveling of bed etc and adding contractor's profit and over head charges etc. complete in all respect
Civil Work
Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. (Note :- Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix). All works up to Plinth Level M-20 grade plain cement concrete. (cement content considered @ 300 kg/cum)
civil work
Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion.
Civil Work
Single piece of stone element with carving work in Bansi Paharpur stone includes stone pillar, stone base, todies and thabi etc carving work as per direction of engineer in charge