Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.6 CrAdmitted-Finance | -21.78% | ₹3.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.1 Cr+₹50.6 L (13.9%)Admitted-Finance | -10.88% | ₹4.1 Cr+₹50.6 L (13.9%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
Tender Value
₹4.6 Cr
EMD Value
₹9.3 L
Closing Date
2 Jul 2026, 6:00 pmClosed
Executive Engineer
KDA Kota
Civil Work
2026_UITKo_567947_1
NIT 06/2026-27 (10)
Open Tender
Civil Works
Percentage
270 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,500
7500 Secrectry KDA, 2500 MD RISL
₹9.3 L
Yes
11 Aug 2026
15 Jun 2026
3 Jul 2026
15 Jun 2026
2 Jul 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and MoRTH specification Clause 2903 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved materia
Ordinary soil | 2,343 | Cum | 178 | ₹4,17,054 |
| 2 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 10 Nominal mix 1:3:6 | 329.75 | Cum | 3,091 | ₹10,19,257.25 |
| 3 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 R.C.C. grade M 25 | 904 | Cum | 3,940 | ₹35,61,760 |
| 4 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and MoRTH specifications Clauses 1009,1600 and 2102 | 56.98 | Tonne | 92,000 | ₹52,42,160 |
| 5 | Providing and laying reinforced cement concrete in superstructure as per drawing and MoRTH specifications Clauses 1700, 2302 and 2304 R.C.C M 25 | 1,284.5 | Cum | 4,794 | ₹61,57,893 |
| 6 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and MoRTH specifications Clauses 1009,1600 and 2302 | 151.25 | Mt | 93,300 | ₹1,41,11,625 |
| 7 | P & F Stone cladding/Flooring works dressed bansi paharpur stone 25mm thick in traditional style used in cladding/Flooring with pattern over 25 to 50 mm thick base in CM 1:6 including pointing with cement mortar 1:2 (cement : 2 stone dust) matche the shade of stone with joint thickness upto 1.5mm as per direction of engineer-in-charge. | 1,050 | Sqm | 2,300 | ₹24,15,000 |
| 8 | Single piece of stone element with carving work in Bansi Paharpur stone includes stone pillar, stone base, todies and thabi etc carving work as per direction of engineer in charge | 21 | CUM | 54,720 | ₹11,49,120 |
| 9Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc. | |||||
| 9.1 | Good soil of earth | 1,344 | cum | 240 | ₹3,22,560 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
Bid_Potential_10.pdf
Tender Documents • 31.54 MB
BOQ_1010345.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .